It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
IMPORTANT:
Pre-drill before fixing screws.
P 17
Please retain product label and instructions for future reference
46
46
Step 31
Parts needed - No. 46 QTY 2
No. 47 QTY 3
Attach the first fascia (
No’s. 46
) to
one of the back sides of the
building, ensuring to trap the felt
between the fascia and the
building.
Secure the fascia into position
using 4x40mm screws, making
sure to fix through the fascia into
the roof purlin, fascia block
and/or log boards.
Once in place, mark the excess
fascia with a pencil and then trim
the fascias to follow the shape of
building as shown in the
illustration. Then attach the other
piece in the same way.
Attach the second fascias
(No.
47)
to the front sides of the
building in the same way as
previously stated.
20x40mm Screws
Pre drill
hole
40mm
screw
47
47
Step 32
Parts needed - No. 48 QTY 8
Arrange the storm braces (
No. 48
)
around the building (
internally
).
Place 2x storm braces per side
fixing into place using 2x 90mm
bolts per brace making sure the
washer & nut are tightened from
the outside of the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
**Storm braces will help your
building expand and contract
properly.
***It is important that each
bolt is tightened using a
washer so as not to damage
the log boards.
16x90mm Bolt Sets
Pre drill
hole
90mm
bolt
48
48
46
47
47