background image

 Assembly of 10x10 Highclere

 

Thank you and congratulations on the purchase of your Shire garden building. 
We believe that this product will give you many years of excellent service. This 
is a natural product manufactured to a high standard therefore if you have any 
queries  or  experience  any  difficulties  then  please  contact  our  customer  service 
hotline  on 

01945  465  295

.  Normal  office  hours:  8.30  am  to  5.00  pm  Monday  to 

Friday.  

Preparation of base 

We recommend that the base onto which your building will stand should be at least 
75mm larger in each direction than the total floor size of the building. 
Actual floor area of the building: 3068x2990 (10’1”x9’10”) 
Total height clearance: 2250mm 
The chosen position in your garden for the siting of the building should be  
excavated to a depth of 75mm to allow a base of sand, on to which paving slabs 
can be evenly laid - 

THEY MUST BE LEVEL AND FIRM.

 

Treatment/care of your Garden Building 

Treat with a suitable decorative wood finish immediately. We recommend that all 
timber pieces be treated again prior to assembly and again within 3 months of  
assembly. We further recommend that all pieces are treated again at least annually 
or as frequently as the instructions on the product used recommends. 
We would suggest that all wall panels be treated in an upside-down position to 
allow the finish/treatment to ingress into the tongue and groove jointing. 
We would also remind you that you would rarely (if ever) be able to re-treat the 
underside of the floor following assembly. We strongly recommend that the  
underside of the floor is treated an absolute minimum of twice (not including  
pre-treatment). 

Garden buildings are not waterproof, therefore on assembling building we 
recommend using a silicon based sealant between wall panels and between 
wall panels and floor. 

 

Gloves

 

Step Ladder

 

Sand Paper

 

Battery-Powered Drill / Screwdriver

 

8mm Drill Bit

 

Pencil

 

Tape Measure

 

Sharp Knife

 

Hammer / Mallet

         

IMPORTANT! 

PLEASE READ PRIOR TO ASSEMBLY OF 
THE BUILDING 

EVERY PRECAUTION IS TAKEN TO 
ENSURE THAT YOUR BUILDING HAS NO 
ELEMENT INCORRECTLY PLACED OR 
POSSIBLY HAZARDOUS, HOWEVER 
PRIOR TO USE PLEASE CHECK ALL 
SURFACES FOR THE FOLLOWING: 
1 RAISED GRAIN, SPLINTERS: sand 
down timber to smooth finish 
2 NAIL/SCREW/PIN HEADS PROUD: tap 
home to be flush with surface of timber 
3 DAMAGED SCREW HEADS 
RESULTING IN SHARP SPLINTERS OF 
METAL: replace 
4 SHARP ENDS OF NAILS/ SCREWS/ 
PINS PROTRUDING THROUGH THE 
PANEL: remove and reposition. 
5 ENSURE ALL PARTS ARE SECURED 
AGAINST REASONABLE FORCE: 
remove and refit 
6 ENSURE THERE ARE NO LOOSE 
PARTS: remove and refit/discard 

We recommend that protective 
gloves be worn throughout

 

Wood is a natural product and is therefore 
prone to changes in appearance, including 
some warping, movement and splitting, 
particularly during unusual climatic conditions 
(long hot or wet spells of weather). As a natural 
occurrence this is not covered by a guarantee. 

     

PLEASE NOTE

 

03/02/12 

   

TOOLS REQUIRED 

QTY    DESCRIPTION 

6     Glazing Panes 550x1535mm 
12   Beading 551 mm 
12   Beading 153

5

 mm 

2     Fascia Sides114x12x3070mm 
2     Fascia Sides114x12x520mm 
2     Fascia Front 114x12x1620mm 

1     Fascia Front 114x12x150mm 

4

     Cover Strip 56x12x2090mm 

3     Cover Strip 56x12x1824mm    
1     Set lever handles 
66    80mm screws 
48    40mm nails 
240    Felt nails 

100   15mm panel pins 
4      Felt Strips 3.3mtr x 1mtr 

Parts 

EXTERNAL VIEW OF PANELS 

Reviews: