background image

P 4

Please retain product label and instructions for future reference

             

Felt Tacks x850

90mm Screw x11

Nail Bag

40mm Screw x320

30mm Screw x86

120mm Screw x11

70mm Screw x84

90mm Bolt Set x16

Pre-assembly

*Please note: 

Each board interlocks at

either end in a staggered pattern.

Before securing ensure that the boards

are fitted properly in their respective

tongue’s and groove’s.

MB16-P-232 QTY 1 
MB16-P-372 QTY 1 
MB16-P-512 QTY 1 
MB16-P-652 QTY 1 
MB16-P-792 QTY 1
MB16-P-932 QTY 1
MB16-P-1072 QTY 1
MB16-P-1211 QTY 1
MB16-P-1351 QTY 1
MB16-P-1491 QTY 1
MB16-P-1631 QTY 1
MB16-P-1771 QTY 1
MB16-P-1911 QTY 1
MB16-P-2051 QTY 1
MB16-P-2191 QTY 1
MB16RT95-P-2290 QTY 1

MB16-P-115 QTY 1
MB16-P-245 QTY 1 
MB16-P-375 QTY 1
MB16-P-505 QTY 1
MB16-P-635 QTY 1
MB16-P-765 QTY 1
MB16-P-895 QTY 1
MB16-P-945 QTY 1
MB16-P-967 QTY 1
MB16-P-989 QTY 1
MB16-P-1011 QTY 1
MB16-P-1032 QTY 1
MB16-P-1054 QTY 1
MB16-P-1076 QTY 1
MB16-P-1098 QTY 1
MB16-P-1120 QTY 1
MB16-P-1141 QTY 1
MB16-P-1163 QTY 1
MB16RT95-P-1180 QTY 1

MB16-C-3726 QTY 19
MB16-P-3726 QTY 1
MB16-P-3715 QTY 1
MB16-P-3603 QTY 1
MB16-P-3491 QTY 1
MB16-P-3379 QTY 1
MB16-P-3267 QTY 1
MB16-P-3155 QTY 1
MB16-P-2043 QTY 1
MB16-P-2931 QTY 1
MB16-P-2819 QTY 1
MB16-P-2707 QTY 1
MB16-P-2595 QTY 1
MB16-P-2483 QTY 1
MB16-P-2371 QTY 1
MB16RG30-P-2259 QTY 1

Roof Board Pack B   QTY 2

AI-0644LOG208RB-V3RBPB

Roof Board Pack A    QTY 1

AI-0644LOG208RB-V3RBPA

MB16-P-220 QTY 1
MB16-P-437  QTY 1
MB16-P-653 QTY 1
MB16-P-869 QTY 1
MB16-P-1085 QTY 1
MB16-P-1302 QTY 1
MB16-P-1518 QTY 1
MB16-P-1578 QTY 1
MB16-C-1578 QTY 10
MB16RT96-C-1578 QTY 1

MB16-P-78 QTY 1
MB16-P-187 QTY 1
MB16-P-295 QTY 1
MB16-P-403 QTY 1
MB16-P-511 QTY 1
MB16-P-619 QTY 1
MB16-P-727 QTY 1
MB16-P-836 QTY 1
MB16-P-944 QTY 1
MB16-P-1052 QTY 1
MB16-P-1160 QTY 1
MB16RT95-P-1244 QTY 1

Roof Board Pack C   QTY 6

AI-0644LOG208RB-V3RBPC

Roof Board Pack D   QTY 2

AI-0644LOG208RB-V3RBPD

55

54

53

52

56

Floor Board Pack 

AI-0644LOG208RB-V3FBP

Summary of Contents for 0644LOG208-V3

Page 1: ...rayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base is going to be construct...

Page 2: ...h Log Board 44x120x2501mm QTY 1 LB44 J 2501 1x45 deg cut 50mm bottom notch window notch Log Board 44x120x2501mm QTY 1 LB44 ADGR 2501 1x45 deg cut right window notch Log Board 44x120x2501mm QTY 7 LB44...

Page 3: ...774mm finished Bearer 44x58x2528mm F4458 2548 2528mm finished 1x45 deg cut Bearer 44x58x2955mm F4458 2315 2295mm finished 1x45 deg cut Bearer 44x58x2105mm F4458 2145 2105mm finished 2x45 deg cut 45 St...

Page 4: ...QTY 1 MB16 P 1054 QTY 1 MB16 P 1076 QTY 1 MB16 P 1098 QTY 1 MB16 P 1120 QTY 1 MB16 P 1141 QTY 1 MB16 P 1163 QTY 1 MB16RT95 P 1180 QTY 1 MB16 C 3726 QTY 19 MB16 P 3726 QTY 1 MB16 P 3715 QTY 1 MB16 P 36...

Page 5: ...er using 10x70mm screws ensuring the frame is flush 10x70mm Screws Pre drill hole 70mm screw Step 2 Parts needed No 37 QTY 9 No 38 QTY 1 No 39 QTY 1 No 40 QTY 1 No 41 QTY 1 No 42 QTY 1 Arrange the rem...

Page 6: ...Screws 70mm screw Step 4 See Pre Assembly Parts needed No 6 QTY 1 Make the assembly level by adding another board No 6 as shown in the diagram Fix using 1x70mm screw Ensure to stagger the screws so a...

Page 7: ...o the assembly to bring the board level to the top of the window and door frames Please note when you get to the top of the boards the right hand boards will be slightly lower Ensure that the boards a...

Page 8: ...o as not to collide with the previous screw Step 13 Parts needed No 19 QTY 1 No 20 QTY 1 Lay the last two boards No 19 20 onto the front of the assembly Fix into position with 2x70mm screws per board...

Page 9: ...ttach the back long roof truss No 35 to the block in the same way Screw down through the purlin at an angle as shown in the diagram using 1x70mm screws 3x70mm Screws Pre drill hole 70mm screw Step 15...

Page 10: ...all of the building 6x90mm Screws Pre drill hole 90mm screw Step 18 You can now fix the assembled roof truss to the building making sure the attached blocks sit inside the assembly Some adjustment may...

Page 11: ...into place using 2x40mm screws per board ensuring to fix through the roof board into the truss below 22x40mm Screws Step 20 Parts needed No 53 QTY 1 No 54 QTY 2 No 55 QTY 6 No 56 QTY 2 Start arrangin...

Page 12: ...ix the first and third board of this layer into place as shown in the diagram Use 2x40mm screws per board ensuring to fix through the roof board into the truss below 22x40mm Screws Step 22 Parts neede...

Page 13: ...am Use 2x40mm screws per board ensuring to fix through the roof board into the truss below 18x40mm Screws Step 23 Parts needed No 53 QTY 1 No 54 QTY 2 No 55 QTY 6 No 56 QTY 2 Continue arranging the ro...

Page 14: ...hown in the diagram Use 2x40mm screws per board ensuring to fix through the roof board into the truss below 18x40mm Screws Pre drill hole 40mm screw IMPORTANT Pre drill before fixing screws Step 26 Pa...

Page 15: ...hown in the illustration ensuring the angled face follows the roof line Once in position fix each trim into place using 6x30mm screws per trim equally spaced along the face of the board 42x30mm Screws...

Page 16: ...nd lay onto the roof in the order shown in the illustration Secure along the outer edge of each felt section using felt tacks spaced out at approximately 100mm intervals Ensure there is 50mm of overha...

Page 17: ...scias to follow the shape of building as shown in the illustration Then attach the other piece in the same way Attach the second fascias No 47 to the front sides of the building in the same way as pre...

Reviews: