P 8
Please retain product label and instructions for future reference
Pre drill
hole
Step 11
Parts needed - No. 21 QTY 5
Align the Purlin (
s
) (No. 21) into the
cut out slots on each gable top ensuring
each purlin interlocks the boards.
Secure the roof purlins at each end by
screwing through the bars into the
boards (ensure to pre-drill to avoid
the boards splitting) using 4x70mm
screws per purlin.
*Please note:
The gable shown is for
illustrative purposes and may differ
in width from your choice in product.
Nevertheless, despite any differences
the process of fixing the roof purlins
is the same.
20x70mm Screws
70mm
screw
Step 10
(See Pre-Assembly)
Parts needed - No. 3 QTY 2
Place the gable tops onto the
assembly. Fix into position by
screwing through the notches
as shown in the illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
21
3
3
IMPORTANT:
Pre-drill before fixing screws.
a
b
a
b