P 5
Please retain product label and instructions for future reference
12
12
11
8
8
11
14
10
14
10
10
10
10
10
IMPORTANT:
Pre-drill before fixing screws.
Step 4
(See Pre-Assembly)
Parts needed - No. 8 QTY 8
No. 11 QTY 4
No. 12 QTY 6
Following the same method
outlined in
Pre-Assembly
, lay
the first 4 boards (No’s. 8, 11 & 12)
onto the starter boards to create
your first level.
*Ensure that the boards are
level and flush with each
other as you lay each one.
Please Note:
The short boards at the
front of the building (either side of
the door and window openings)
can be placed either side depending
on your needs.
Step 5
(See Pre-Assembly)
Parts needed - No. 9 QTY 12
No. 10 QTY 36
No. 11 QTY 6
No. 13 QTY 12
No. 14 QTY 12
Following the same method
outlined in
Pre-Assembly
, lay
the next 6 boards (No’s. 9, 10,
11, 13 & 14) onto the
assembly to create your
second level.
*Ensure that the boards are
level and flush with each
other as you lay each one.
*Doors can be hung once the
boarding has enclosed the
door frame by 12-13 boards,
refer to door installation
instructions, if not, you can
install the door at step 8.
***Please Note:
The short boards placed
to create the opening’s for the doors &
windows can be placed either side
depending on your needs.
13
13
9
9