P 7
Please retain product label and instructions for future reference
Step 9
Parts needed - No. 3 QTY 2
Combine the two sections of the
gable (No. 3) and secure together
using 4x120mm (
per gable
) as
shown in the illustration.
*Ensure the boards are level with
each end.
8x120mm Screws
Pre drill
hole
120mm
screw
3
Step 8
(See Pre-Assembly)
Parts needed - No. 9 QTY 14
No. 10 QTY 42
No. 11 QTY 9
No. 13 QTY 14
No. 14 QTY 14
No. 15 QTY 1
No. 16 QTY 2
Following the same method
outlined in
Pre-Assembly
, lay
the remaining boards (No’s. 9,
10, 11, 13, 14, 15 & 16) onto the
assembly to bring the board
level to the top of the window
and door frames.
*Ensure that the boards are
level and flush with each
other as you lay each one.
*Doors can be hung once the
boarding has enclosed the
door frame.
IMPORTANT:
Pre-drill before fixing screws.
11
14
10
14
10
10
10
10
10
13
13
9
9
15
16
16