Please retain product label and instructions for future reference
Step 14
Parts needed - No. 17 QTY 66
Place the first floor board (No. 17)
inside the building flush to the log
board on one side. Continue adding
the floor boards (
internally
) making
sure to interlock each individual
board.
*Do
NOT
secure the boards until
the last board has been measured
and cut.
Following the same method outlined
previously, measure the gap between
the bottom of the tongue (on the last
board placed) and the log board.
Using a straight edge mark out the
measurement onto the last floor
board (No. 17) and cut along the
length removing the excess.
**Please note:
Mark the final board
2mm under the measurement; This
will allow the timber to expand and
contract correctly.
Once all the floor boards are in
position secure each board into
position using 8x40mm screws.
***Please Note:
Ensure to screw
through each of the floor boards
into the floor bearers.
528x40mm Screws
40mm
screw
Pre drill
hole
*
Cut to fit
Roof
Closure Trim
Internal
25
Step 15
Parts needed - No. 25 QTY 9
Inside the building place the closure
trim (No. 25) against the boarding and
align with the roof as shown in the
illustration.
Once in position fix each trim
into place by pre drilling a pilot hole
and using 6x30mm screws per trim,
equally spacing them along the face of
the board.
54x30mm Screws
Pre drill
hole
30mm
screw
*
trim to fit
*Measure and cut the
closure trims to
fit the internal space.
25
25
Step 16
Parts needed - No. 25 QTY 9
Once the floor has been laid arrange the
closure trim (No. 25) around the outside edge
of floor (internally), measure and cut down
accordingly to best match the internal
space.
Secure each trim section into place
using 6x30mm spaced equally along the
board as shown in the illustration.
*Do NOT fix the closure trim to the floor
boards.
54x30mm Screws
30mm
screw
Pre drill
hole
*
Cut to fit