P 15
Please retain product label and instructions for future reference
IMPORTANT :
Pre-drill before fixing screws.
IMPORTANT :
Pre-drill before fixing screws.
Pre drill
hole
60mm
bolt
44
44
Step 27
Parts needed - No. 44 QTY 8
Arrange the storm braces
(No.44)
around the building (
internally
),
Placing 2xStorm braces per side, fixing
into place using 2x 60mm bolts per
brace ,making sure the washer & nut
are tightened from the outside of the
building.
*Ensure the storm braces are secured
at the highest point possible on each
side.
The storm braces will need to be
altered during the buildings life as the
moisture content within the log boards
changes. The boards will expand
during periods of high moisture
(Winter) and shrink during periods of
low moisture (Summer.)
**Storm braces will help your building
expand and contract properly.
***Important: Ensure each bolt is
tightened using a washer so as not to
damage the log boards.
16x60mm Bolt Sets
Step 28
Parts Needed: No. 6 QTY 2
No. 16 QTY 1
Attach the Rain Guards
(No. 6)
to the
Window frame, fixing in place onto
the framing above the window using
3x70mm screws per guard.
Attach the Rain Guard
(No. 16)
to the
Door frame, fixing in place onto the
framing above the Door using
3x70mm screws.
9x70mm Screws.
70mm
screw
Pre drill
hole
6
16
6
6
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
SILICONE
SEALANT
It is ESSENTIAL to seal around all
window framing with sillicone
sealant (not included) to
minimise water ingress.