background image

3x Roof Support block- 45x 210mm

Framing

1x Rear roof framing- 32 x 2018mm

1x Rear roof framing- 32 x 2049mm

1x Front roof framing- 32 x 1196mm

2x Side roof framing- 32 x 1149mm

1x Rear Panel Framing- 32 x 1806mm

6

7

8

9

10

11

12

17

18

19

13

14

15

16

1x Large Roof Support bar- 60 x 2650mm

1x Back Roof Support bar- 60 x 1303mm

1x Front Roof Support bar- 60 x 748mm

5x L’ Bracket

Felt

2x barrel bolt

30mm Screw x45

50mm Screw x28

60mm Screw x8

100mm Screw x8

40mm Screw x70

Felt Tacks x100

10mm Screw x8

20

Felt & Ironmongrey

Hinge x6

16mm Black Screw x6

Press Lock 

Chrome Handle QTY 2

Remove transportation 
blocks from the bottom 
of each panel before 
beginning assembly. Each 
Panel should have two.

Attach the butt hinges to 
the door and door panel 
using 6x25mm screws per 
hinge.

Pre Assembly 

25mm 

screw

20

Pre drill 

hole

36x25mm Screws

P8

P7

P2

35mm Coach Screw x4 

Place floor on a firm and level 
base, ensure base has suitable 
drainage  free from areas 
where standing water can 
collect.  (see front page on 
base requirements). 

Step 1

P3

Turn 

button 

21

Reviews: