85-03-00955
P a g e
|
33
MASTER FLUE VENTING REQUIREMENTS CHART
NOTE:
THIS CHART IS APPLICABLE TO NATURAL GAS ONLY. FOR LPG INSTALLATIONS, SEE TABLE ON LEFT
SIDE OF THE CHART, BELOW.
Important Notes:
- Always use the longest vertical starter pipe section as the first vertical section attached to the fireplace directly.18” mini-
mum vertical section is required for Natural Gas and 24” minimum vertical section for LPG applications.
- 6 inches maximum horizontal pipe run allowed with a 90
0
elbow connected to the 18” minimum vertical section Natural
Gas and 24” vertical section LPG.
- Maximum Vertical Run allowed is 40 feet.
- Maximum Vent System length allowed is 42 feet.
- Maximum number of 90
o
elbows allowed in Zone A is 3 and in Zone B is 4.
- In
Zone “A”
, 32 feet maximum horizontal run allowed with a 4 feet starter section for NG and 27 feet maximum horizon-
tal for LPG. If the starter vertical section is less than 4 feet, use the chart and reduce 4 feet for every 90
0
elbow installed
after the first 90
0
elbow.
- In
Zone “B”
, 32 feet maximum horizontal run allowed NG (27 feet max for LPG) only if the first vertical section con-
nected directly to the top of this fireplace is 4 feet or longer.
High Altitude Installation Information
: Prior to installing at altitudes higher than 7500, please contact the Mendota t
e
ch-
nical service department for specific venting requirements and venting restrictions.
Natural Gas ONLY
V min
H max
18 in.
6 in.
24 in.
6 ft.
30 in.
13 ft.
36 in.
19 ft.
42 in.
25-1/2 ft.
48 in.
32 ft.
4 ft. - 10 ft. 32 ft.
10 ft. - 40 ft. Varies
**LPG
V min
H max
24 in. (LPG) 6 in.
30 in.
8 ft.
36 in.
14 ft.
42 in.
20 ft.
48 in.
27 ft.
4 ft. - 10 ft. 27fft.
10 ft. - 40 ft. Varies