![background image](http://html1.mh-extra.com/html/melec/gd-5410/gd-5410_instruction-manual_1767062027.webp)
Instructions Manual
7.Confirmation of Setting and Connection
7-1.Check Points
(1) This product requires different switch setting and motor wiring depending on
the motor used.
Check if the switch setting and the motor wiring are correctly performed.
(2) Check if the protective earth terminal
of J2 is securely wired.
(3) Check if the terminal block covers are fixed on J2 and J3.
Setting of HOLD CURRENT
SELECT switch
Connection of J2
Connection of J3
Protective earth terminal
AC input terminal (L,N)
Switch No.
Terminal block cover
Motor output terminal
Terminal block cover
Setting of HOLD SWITCHING TIME
SELECT switch
HIGH-SPEED POWER OUTPUT
SELECT switch
Setting of DRIVE CURRENT
SELECT switch
DHT2,DHT1
Switch No.
Connection of J1
10L/5L
Remarks
Check
Check Points
Setting of MOTOR
SELECT switch
Switch No.
L/H
LP/HP
Setting of STEP ANGLE
SELECT switch
-27-
Summary of Contents for GD-5410
Page 12: ...Instructions Manual 3 Name and Function of Each Section 3 1 Signal I O Connector J1 12 ...
Page 13: ...Instructions Manual 3 2 AC Input Motor Output Terminal Block J2 J3 13 ...
Page 33: ...Instructions Manual 10 3 I O Signal R3 1 Example Circuit Connection 33 ...
Page 39: ...Instructions Manual 10 4 Dimensions Unit mm 39 ...
Page 42: ...Instructions Manual 42 ...
Page 43: ...Instructions Manual 43 ...
Page 44: ...Instructions Manual 44 ...
Page 45: ...Instructions Manual 45 ...
Page 46: ...Instructions Manual 46 ...