Meiko GK 60 Operating Instructions Manual Download Page 6

Operating instructions GK 60 

 

 

 

Datei:BA_GK60_9670999_EN_1997-08.doc 

 

9670999

 

6/24 

W e reserv e the right to change ex ecution and construction!

  

MEIKO Maschinenbau GmbH & Co. KG,  Englerstr. 3,  D-77652 Offenburg,  Tel.: +49/781/203-0,  Fax: +49/781/203-1121

 

EC Declaration of Conformity 

 

 

Muster

 / Example / Exemple / Esempio / Ejemplo / Voorbeeld

 

 

EG-Konformitätserklärung

 

 

EC Declaration of Conformity / Déclaration de conformité CE / Dichiarazione di conformità CE / Declaración de conformidad CE / CE-conformiteitsverklaring

 

 

 

Firma 

/ Company / Société / Ditta / Empresa / Fabrikant:

 

Adresse 

/ Address / Adresse / Indirizzo / Dirección / Adres

:

 

 

 

MEIKO Maschinenbau GmbH & Co. KG 

Englerstraße 3 
77652 Offenburg 
Germany

 

 

 

 

Kontakt 

Contact / Contact / Contatto / Contacto / Contact

 

Internet:  www.meiko.de 
E-mail:  

[email protected] 

Telefon:  +49(0)781/203-0

 

 

 

Auftrag Nr. 

Order no. / No. de commande / No. d’ordine / No. de pedido / Opdracht nr.:

 

             

 

 

Spülmaschine Typ 

GK60 

 

Dishwasher model / Lave-vaisselle modèle / Lavastoviglie modello / 
Lavavajillas modelo / Vaatwasmachine model 

 

 

Konformitätserklärung 

Declaration of Conformity / Déclaration de conformité / Dichiarazione di conformità / Declaración de conformidad / Conformitetsverklaring

 

Hiermit bescheinigen wir in alleiniger Verantwortung die Konformität des Erzeugnisses mit den grundlegenden 
Anforderungen der folgenden EG-Richtlinien, harmonisierten Normen, nationalen Normen. 

We hereby declare at our sole responsibility that the product conforms to the essential requirements of the following EC Directives, harmonized standards, 
national standards. 

Par la présente nous certifions sous notre seule responsabilité la conformité du produit  avec les exigences fondamentales des directives CE, 
normes harmonisées et normes nationales suivantes. 

Con la presente dichiariamo sotto la nostra responsabilità la conformità del prodotto con i regolamenti basilari delle seguenti direttive CE, 
normative armonizzate e normative nazionali. 

Por la presente declaramos bajo nuestra sola responsabilidad que nuestros productos están en conformidad con las exigencias básicas de las siguientes 
directivas de la CE, normas homologadas y normas nacionales. 

Hiermee verklaren wij onder geheel eigen verantwoordelijkheid de conformiteit van het product met de fundamentele en gestelde eisen volgens 
EG-richtlijnen, geharmoniseerde normen en nationale normen.

 

 

EG-Richtlinie

 / EC Directive / Directive CE / Regolamento CE / Directiva CE / EG-richtlijn

 

 

2006/42/EG  / 2014/30/EU 

 

Dokumentationsbevollmächtigter

 

 

Viktor Maier 

Responsible for documentation / Responsable de la documentation / Responsabile della 
documentazione/ Responsable de la documentación / Voor deze documentatie verantwoordelijk

 

MEIKO Maschinenbau GmbH & Co. KG

 

Englerstr. 3 

– 77652 Offenburg - Germany

 

 

 

 

 

 

 

MEIKO Maschinenbau GmbH & Co. KG

 

 
ppa. 

(per procura) 

 

 

 

 

 

 

Dr. Thomas Peukert

 

Leiter Entwicklung und Konstruktion 

Head of Development-Design / Responsable Développement-Construction / Direttore Sviluppo- 
Costruzione / Jefe de la sección de desarrollo y diseño / Chef Ontwikkeling-Constructie

 

 
 

 

Summary of Contents for GK 60

Page 1: ...construction MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating Instructions Salad and vegetable washing machine GK 60 TRANSLATION OF THE ORIGI...

Page 2: ...11 6 5 Requirements for the fresh water connection 11 6 6 Requirements for the waste water connection 12 6 7 Emergency off 12 7 Settings for initial commissioning by the service engineer 12 7 1 Commis...

Page 3: ...no liability for any additional damage caused as a result MEIKO is constantly working on the further development of all its models We would therefore ask you to understand that because of this we must...

Page 4: ...lems etc directly to MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 OFFENBURG Phone 49 0 781 203 0 http www meiko de info meiko de or Name and address of the MEIKO branch manufacturer s agent or de...

Page 5: ...mbol warns that there is danger to the installation to material or to the environment This symbol denotes information that helps you to understand the installation s operation Warning of dangerous ele...

Page 6: ...the product conforms to the essential requirements of the following EC Directives harmonized standards national standards Par la pr sente nous certifions sous notre seule responsabilit la conformit d...

Page 7: ...riately qualified and authorized personnel use maintain and repair the installation CAUTION the relevant personnel is regularly trained in all questions relating to safety at work and environmental pr...

Page 8: ...nd rectification work on the electrical part of the machine The Health and Safety Regulations must be observed The machine may be used again only after all cladding panels have been installed by the u...

Page 9: ...t by a qualified electrician Check the electrical equipment regularly Tighten any loose connections Replace any damaged leads cables immediately 7 Delivery shipping installation and assembly 7 1 Deliv...

Page 10: ...e tables upon request The following must be observed during the installation of the machine The complete unit must be levelled in both directions using a water level Compensate for an uneven floor by...

Page 11: ...ring diagram is behind the front panel resp front cladding of the appliance The enclosed wiring diagram must remain in the appliance Note to customers Dishwashing machines bedpan rinsing units and sys...

Page 12: ...rap made of strip steel may be recycled with the steel scrap The plastic tensioning strap of plastic PP can be recycled 8 Settings for initial commissioning by the service engineer 8 1 Commissioning I...

Page 13: ...997 08 doc 9670999 13 24 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 9 Washing with the s...

Page 14: ...tle 8 1 Radishes asparagus brussels sprout strong 8 Black salsify celeriac paprika carrots horse radish kohlrabi leek strong 8 Tomatoes gentle 6 8 1 Mushrooms gentle 8 1 Apples pears gentle 2 4 Strawb...

Page 15: ...is programme only one of both circulation pumps is running Thus guaranteeing the gentle cleaning of delicate items f ex salad Strong wash programme The running of both circulation pumps allows a stron...

Page 16: ...amp goes out Open the tank cover Remove the basket cover Remove the wash basket with items 10 Separate spin programme This programme allows that the items are spun without previous wash cycle The foll...

Page 17: ...nning water The inserts for the final rinse nozzles must be inserted with the prongs facing the water flow 12 2 1 Safety instructions for cleaning CAUTION The machine switch cabinet and other electric...

Page 18: ...zles the current water in the wash tank as well as the rotating movement and the lifting and lowering of the wash basket the items are gently washed During the wash process the tank water is automatic...

Page 19: ...ity Installation and assembly Commissioning Operation use Cleaning Checking safety devices Fault finding Troubleshooting mechanical Troubleshooting electrical Maintenance Repairs Training should be re...

Page 20: ...eaned Lifting and lowering device does not function The dirt trap of the solenoid valve is blocked and must be cleaned The local water pressure is too low 17 Maintenance Regular maintenance is a prere...

Page 21: ...tenance or repair work Failure to observe these precautions can result in severe physical injury or damage to property CAUTION Before carrying out any maintenance and repair work ensure that all the p...

Page 22: ...tank Check that wash water pipe is watertight Check washing system is complete and produces correct spray pattern Check wash arm hubs 3 Fresh water rinse Check flow water pressure Check rinsing syste...

Page 23: ...at least once a year 9 Detergent dosing Check dosage adjust if necessary 10 Rinse aid dosing Check dosage adjust if necessary 11 Operation check of the complete machine Check machine for correct inte...

Page 24: ......

Page 25: ...9683014 START 1 2 3 CLEAN STOP GK 60...

Page 26: ...r sente nous certifions sous notre seule responsabilit la conformit du produit avec les exigences fondamentales des directives CE normes harmonis es et normes nationales suivantes Con la presente dich...

Page 27: ......

Page 28: ...htes Dokument downloaden und ffnen Download the document you require and open it T l charger le document souhait et l ouvrir Descargar y abrir el documento deseado Het gewenste document downloaden en...

Reviews: