Meiko GK 60 Operating Instructions Manual Download Page 21

Operating instructions GK 60 

 

 

 

Datei:BA_GK60_9670999_EN_1997-08.doc 

 

9670999

 

21/24 

W e reserv e the right to change ex ecution and construction!

  

MEIKO Maschinenbau GmbH & Co. KG,  Englerstr. 3,  D-77652 Offenburg,  Tel.: +49/781/203-0,  Fax: +49/781/203-1121

 

17.1  Basic safety measures during normal operation 

Observe the maintenance periods prescribed in the operating instructions! 
Observe  the  maintenance  instructions  given  in  these  operating  instructions  for  individual 
components! 

 

CAUTION!

 

Before carrying out any maintenance or repair work, prohibit access to the operating area 
to  any  unauthorized  persons!  Provide  or  display  a  sign  drawing  attention  to  the 
maintenance or repair work! 

 

Before implementing any maintenance or repair work the machine must be switched off 
completely  via  the  on-site  power  disconnection  device  and  secured  against  reactivation 
by using appropriate measures (e.g. via a padlock whose key is in the possession of the 
person conducting the maintenance or repair work)! Failure to observe these precautions 
can result in severe physical injury or damage to property. 

 

CAUTION!

 

Before  carrying  out  any  maintenance  and  repair  work,  ensure  that  all  the  parts  of  the 
machine that may be touched have cooled down to room temperature! 

Carefully dispose of any cleaning products that could harm the environment! 

17.1.1  Before putting back into operation following maintenance or 

repair work 

 

CAUTION!

 

Before  starting  operations  following  maintenance  or  repair  work,  all initial tests must be 
carried  out  as  described  in  “Machine  Settings  for  Initial  Commissioning  by  the  Service 
Engineer”. 

17.1.2  Observe the environmental protection regulations 

 

CAUTION!

 

Legal  obligations  relating  to  the  avoidance  of  waste  materials  and  to  their 
recycling/removal in accordance with applicable regulations must be observed! 

In particular, during installation, repair and maintenance work, materials that could pollute 
water such as: Grease and oils, Cleaning fluids containing solvents, must not pollute the 
ground  or  run  into  the  sewerage  system!  These  materials  must  be  stored,  shipped, 
collected and disposed of in suitable containers! 

 

Summary of Contents for GK 60

Page 1: ...construction MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating Instructions Salad and vegetable washing machine GK 60 TRANSLATION OF THE ORIGI...

Page 2: ...11 6 5 Requirements for the fresh water connection 11 6 6 Requirements for the waste water connection 12 6 7 Emergency off 12 7 Settings for initial commissioning by the service engineer 12 7 1 Commis...

Page 3: ...no liability for any additional damage caused as a result MEIKO is constantly working on the further development of all its models We would therefore ask you to understand that because of this we must...

Page 4: ...lems etc directly to MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 OFFENBURG Phone 49 0 781 203 0 http www meiko de info meiko de or Name and address of the MEIKO branch manufacturer s agent or de...

Page 5: ...mbol warns that there is danger to the installation to material or to the environment This symbol denotes information that helps you to understand the installation s operation Warning of dangerous ele...

Page 6: ...the product conforms to the essential requirements of the following EC Directives harmonized standards national standards Par la pr sente nous certifions sous notre seule responsabilit la conformit d...

Page 7: ...riately qualified and authorized personnel use maintain and repair the installation CAUTION the relevant personnel is regularly trained in all questions relating to safety at work and environmental pr...

Page 8: ...nd rectification work on the electrical part of the machine The Health and Safety Regulations must be observed The machine may be used again only after all cladding panels have been installed by the u...

Page 9: ...t by a qualified electrician Check the electrical equipment regularly Tighten any loose connections Replace any damaged leads cables immediately 7 Delivery shipping installation and assembly 7 1 Deliv...

Page 10: ...e tables upon request The following must be observed during the installation of the machine The complete unit must be levelled in both directions using a water level Compensate for an uneven floor by...

Page 11: ...ring diagram is behind the front panel resp front cladding of the appliance The enclosed wiring diagram must remain in the appliance Note to customers Dishwashing machines bedpan rinsing units and sys...

Page 12: ...rap made of strip steel may be recycled with the steel scrap The plastic tensioning strap of plastic PP can be recycled 8 Settings for initial commissioning by the service engineer 8 1 Commissioning I...

Page 13: ...997 08 doc 9670999 13 24 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 9 Washing with the s...

Page 14: ...tle 8 1 Radishes asparagus brussels sprout strong 8 Black salsify celeriac paprika carrots horse radish kohlrabi leek strong 8 Tomatoes gentle 6 8 1 Mushrooms gentle 8 1 Apples pears gentle 2 4 Strawb...

Page 15: ...is programme only one of both circulation pumps is running Thus guaranteeing the gentle cleaning of delicate items f ex salad Strong wash programme The running of both circulation pumps allows a stron...

Page 16: ...amp goes out Open the tank cover Remove the basket cover Remove the wash basket with items 10 Separate spin programme This programme allows that the items are spun without previous wash cycle The foll...

Page 17: ...nning water The inserts for the final rinse nozzles must be inserted with the prongs facing the water flow 12 2 1 Safety instructions for cleaning CAUTION The machine switch cabinet and other electric...

Page 18: ...zles the current water in the wash tank as well as the rotating movement and the lifting and lowering of the wash basket the items are gently washed During the wash process the tank water is automatic...

Page 19: ...ity Installation and assembly Commissioning Operation use Cleaning Checking safety devices Fault finding Troubleshooting mechanical Troubleshooting electrical Maintenance Repairs Training should be re...

Page 20: ...eaned Lifting and lowering device does not function The dirt trap of the solenoid valve is blocked and must be cleaned The local water pressure is too low 17 Maintenance Regular maintenance is a prere...

Page 21: ...tenance or repair work Failure to observe these precautions can result in severe physical injury or damage to property CAUTION Before carrying out any maintenance and repair work ensure that all the p...

Page 22: ...tank Check that wash water pipe is watertight Check washing system is complete and produces correct spray pattern Check wash arm hubs 3 Fresh water rinse Check flow water pressure Check rinsing syste...

Page 23: ...at least once a year 9 Detergent dosing Check dosage adjust if necessary 10 Rinse aid dosing Check dosage adjust if necessary 11 Operation check of the complete machine Check machine for correct inte...

Page 24: ......

Page 25: ...9683014 START 1 2 3 CLEAN STOP GK 60...

Page 26: ...r sente nous certifions sous notre seule responsabilit la conformit du produit avec les exigences fondamentales des directives CE normes harmonis es et normes nationales suivantes Con la presente dich...

Page 27: ......

Page 28: ...htes Dokument downloaden und ffnen Download the document you require and open it T l charger le document souhait et l ouvrir Descargar y abrir el documento deseado Het gewenste document downloaden en...

Reviews: