Meiko GK 60 Operating Instructions Manual Download Page 19

Operating instructions GK 60 

 

 

 

Datei:BA_GK60_9670999_EN_1997-08.doc 

 

9670999

 

19/24 

W e reserv e the right to change ex ecution and construction!

  

MEIKO Maschinenbau GmbH & Co. KG,  Englerstr. 3,  D-77652 Offenburg,  Tel.: +49/781/203-0,  Fax: +49/781/203-1121

 

15 

Staff training 

Only  trained  and  instructed  personnel  are  allowed  to  work  on  the  machine.    Staff 
responsibilities  for  the  installation’s  operation,  maintenance  and  repair  must  be  clearly 
defined.  
Any  personnel  undergoing  training  are  only  allowed  to  work  on  the  machine  installation 
under the supervision of an experienced person. 

 

 

Persons 

 

Trained operating 

personnel 

Trained 

in-house 

technician 

Trained in-house 

technician or 

installation 

engineer 

activity 

 

 

 

Installation and assembly 

 

 

 

Commissioning 

 

 

 

Operation, use 

 

 

 

Cleaning 

 

 

 

Checking safety devices 

 

 

 

Fault finding 

 

 

 

Troubleshooting, 

mechanical 

 

 

 

Troubleshooting, 

electrical 

 

 

 

Maintenance 

 

 

 

Repairs 

 

 

 

 

Training should be recorded in writing. 

16 

Operating errors 

Despite being expertly designed, the machine may develop minor faults which are usually 
easy to eliminate. This section explains a number of possible problems and how you can 
deal with them yourself. 

 

Before carrying out work on the open appliance, it MUST be disconnected from the 
power supply. The machine is to be switched off completely with the on-site power 
disconnection device here. Should any of the operational faults described arise 
repeatedly, their cause must be established in each case. 

 

Faults not described here can in general only be eliminated by a technician or 
electrician. Please contact the agency responsible or the authorised dealer. 

 

Summary of Contents for GK 60

Page 1: ...construction MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating Instructions Salad and vegetable washing machine GK 60 TRANSLATION OF THE ORIGI...

Page 2: ...11 6 5 Requirements for the fresh water connection 11 6 6 Requirements for the waste water connection 12 6 7 Emergency off 12 7 Settings for initial commissioning by the service engineer 12 7 1 Commis...

Page 3: ...no liability for any additional damage caused as a result MEIKO is constantly working on the further development of all its models We would therefore ask you to understand that because of this we must...

Page 4: ...lems etc directly to MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 OFFENBURG Phone 49 0 781 203 0 http www meiko de info meiko de or Name and address of the MEIKO branch manufacturer s agent or de...

Page 5: ...mbol warns that there is danger to the installation to material or to the environment This symbol denotes information that helps you to understand the installation s operation Warning of dangerous ele...

Page 6: ...the product conforms to the essential requirements of the following EC Directives harmonized standards national standards Par la pr sente nous certifions sous notre seule responsabilit la conformit d...

Page 7: ...riately qualified and authorized personnel use maintain and repair the installation CAUTION the relevant personnel is regularly trained in all questions relating to safety at work and environmental pr...

Page 8: ...nd rectification work on the electrical part of the machine The Health and Safety Regulations must be observed The machine may be used again only after all cladding panels have been installed by the u...

Page 9: ...t by a qualified electrician Check the electrical equipment regularly Tighten any loose connections Replace any damaged leads cables immediately 7 Delivery shipping installation and assembly 7 1 Deliv...

Page 10: ...e tables upon request The following must be observed during the installation of the machine The complete unit must be levelled in both directions using a water level Compensate for an uneven floor by...

Page 11: ...ring diagram is behind the front panel resp front cladding of the appliance The enclosed wiring diagram must remain in the appliance Note to customers Dishwashing machines bedpan rinsing units and sys...

Page 12: ...rap made of strip steel may be recycled with the steel scrap The plastic tensioning strap of plastic PP can be recycled 8 Settings for initial commissioning by the service engineer 8 1 Commissioning I...

Page 13: ...997 08 doc 9670999 13 24 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH Co KG Englerstr 3 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 9 Washing with the s...

Page 14: ...tle 8 1 Radishes asparagus brussels sprout strong 8 Black salsify celeriac paprika carrots horse radish kohlrabi leek strong 8 Tomatoes gentle 6 8 1 Mushrooms gentle 8 1 Apples pears gentle 2 4 Strawb...

Page 15: ...is programme only one of both circulation pumps is running Thus guaranteeing the gentle cleaning of delicate items f ex salad Strong wash programme The running of both circulation pumps allows a stron...

Page 16: ...amp goes out Open the tank cover Remove the basket cover Remove the wash basket with items 10 Separate spin programme This programme allows that the items are spun without previous wash cycle The foll...

Page 17: ...nning water The inserts for the final rinse nozzles must be inserted with the prongs facing the water flow 12 2 1 Safety instructions for cleaning CAUTION The machine switch cabinet and other electric...

Page 18: ...zles the current water in the wash tank as well as the rotating movement and the lifting and lowering of the wash basket the items are gently washed During the wash process the tank water is automatic...

Page 19: ...ity Installation and assembly Commissioning Operation use Cleaning Checking safety devices Fault finding Troubleshooting mechanical Troubleshooting electrical Maintenance Repairs Training should be re...

Page 20: ...eaned Lifting and lowering device does not function The dirt trap of the solenoid valve is blocked and must be cleaned The local water pressure is too low 17 Maintenance Regular maintenance is a prere...

Page 21: ...tenance or repair work Failure to observe these precautions can result in severe physical injury or damage to property CAUTION Before carrying out any maintenance and repair work ensure that all the p...

Page 22: ...tank Check that wash water pipe is watertight Check washing system is complete and produces correct spray pattern Check wash arm hubs 3 Fresh water rinse Check flow water pressure Check rinsing syste...

Page 23: ...at least once a year 9 Detergent dosing Check dosage adjust if necessary 10 Rinse aid dosing Check dosage adjust if necessary 11 Operation check of the complete machine Check machine for correct inte...

Page 24: ......

Page 25: ...9683014 START 1 2 3 CLEAN STOP GK 60...

Page 26: ...r sente nous certifions sous notre seule responsabilit la conformit du produit avec les exigences fondamentales des directives CE normes harmonis es et normes nationales suivantes Con la presente dich...

Page 27: ......

Page 28: ...htes Dokument downloaden und ffnen Download the document you require and open it T l charger le document souhait et l ouvrir Descargar y abrir el documento deseado Het gewenste document downloaden en...

Reviews: