Operating instructions FV 28 GiO
Datei:1D3A4F9D.doc
9671086
37/38
W e reserv e the right to change ex ecution and construction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
Maintenance procedures
FV
2
8
G
/
FV
2
8
GI
O
E
c
o
S
ta
r
4
3
0
F
E
c
o
S
ta
r
5
3
0
F
-M
FV
4
0
.2
/
FV
6
0
.2
/
FV
7
0
.2
D
GK
6
0
OR
5
0
H
E
co
S
ta
r 5
4
5
D /
DV
8
0
.2
/
D
V
1
2
0
.2
/
DV
1
2
5
.2
/
DV
2
0
0
.2
/
DV
2
0
0
.2
P
W
D
V
2
7
0
B
FV
1
3
0
.2
–
FV
2
5
0
.2
/
D
V
2
7
0
.2
C
o
mpo
n
e
n
t
OK
C
o
mpo
n
e
n
t
fa
u
lt
y
C
o
mpo
n
e
n
t
re
p
lac
e
d
8. Electrical safety check (certificate is optional)
Visual inspection
at least
once a
year
Protective conductor check
at least
once a
year
Measure insulation resistance
at least
once a
year
Protection conductor current measurement
at least
once a
year
9. Detergent dosing
Check dosage, adjust if necessary
10. Rinse aid dosing
Check dosage, adjust if necessary
11. Operation check of the complete machine
Check machine for correct interaction of all functions
12. Test run
Check results of test wash and rinse
brief instruction for new personnel
19
Environmentally acceptable measures, Disposal of the
installation
Each discarded appliance is to be made immediately unserviceable - to avoid later acci-
dents.
Switch the machine off completely via the on-site power disconnection device.
When you eventually dispose of the installation (dismantlement/scrapping), the parts and
their corresponding materials should preferably be re-used.
Here is a list of the materials that most frequently occur when dismantling:
Chrome-nickel-steel
Aluminum
Copper
Brass
Electrical and electronic parts
PP and other synthetic materials
20
Documentation
Installation drawing / technical sheet
Technical data sheet
Wiring diagram / Programming instructions
Installation regulations - general information