ADDENDUM B
SAMPLE DEMAND TRAINING
This Addendum is meant to offer a possible sample training to illustrate power and
energy parameters.
1.
Initial PQ Simulator Configuration
Configure the PQ Simulator as shown in
Section 7: Initial Settings
of this manual.
2.
Program the MPQ Analyzer
Programming the MPQ Analyzer for 115V input from simulator.
Voltage sag / dip limit
108.00
Voltage swell limit
132.00
Fast transient limit
400.00
THD limit
5.0
RMS storage interval
3 Seconds
Demand Configuration
4-Wire Wye 3-Wattmeter
Demand Storage Interval
5 Minutes
See
Addendum 4 - Complete 115V MPQ Setup File
for full setup file.
Programming the MPQ Analyzer for 230V input from simulator.
Voltage sag / dip limit
207.00
Voltage swell limit
262.00
Fast transient limit
600.00
THD limit
5.0
RMS storage interval
3 Seconds
Demand Configuration
4-Wire Wye 3-Wattmeter
Demand Storage Interval
5 Minutes
See
Addendum 5 - Complete 230V MPQ Setup File
for full setup file.
Connect the unit to the simulator as shown in Section 6
Product Installation
of this
manual.
Test Equipment Depot - 800.517.8431
99 Washington Street, Melrose, MA 02176
TestEquipmentDepot.com
Summary of Contents for MPQSIM
Page 2: ......
Page 3: ...MPQSIM User Manual...
Page 8: ...M AVTMMPQSIM Rev 1 May 2017 2 M...
Page 10: ...M AVTMMPQSIM Rev 1 May 2017 4 M...
Page 20: ...M AVTMMPQSIM Rev 1 May 2017 14 M...
Page 36: ...M AVTMMPQSIM Rev 1 May 2017 30 M...