AVTMMPQSIM Rev 1 May 2017
11
6
PRODUCT INSTALLATION
Connector Layout / Interconnect
Plug the AC Adapter into the AC Adapter jack of the MPQSIM product.
When used with an MPQ1000:
1. Connect the Phase C RTN jack on the MPQSIM to Earth Ground.
2. Connect the GND input on the MPQ1000 to Earth Ground.
3. Plug the Phase A voltage lead (supplied with the Megger PQ Product) between
the Phase A 115V or 230V banana jack on the MPQ-SIM and the Phase A
voltage input of the MPQ1000.
4. Plug the Phase B voltage lead (supplied with the Megger PQ Product) between
the Phase B 115V or 230V banana jack on the MPQ-SIM and the Phase B voltage
input of the MPQ1000.
White Jacks - Return
Yellow Jacks – 115VAC
Red Jacks – 230VAC
Current Channel
Connectors
AC Adapter
Jack
Summary of Contents for MPQSIM
Page 2: ......
Page 3: ...MPQSIM User Manual...
Page 8: ...M AVTMMPQSIM Rev 1 May 2017 2 M...
Page 10: ...M AVTMMPQSIM Rev 1 May 2017 4 M...
Page 20: ...M AVTMMPQSIM Rev 1 May 2017 14 M...
Page 36: ...M AVTMMPQSIM Rev 1 May 2017 30 M...