PRODUCT OPERATION
AVTMMPQSIM Rev 1 May 2017
17
CONTROL
SETTING
Phase B Voltage Harmonics
OFF
Phase B Current Harmonics
OFF
PHASE C
Phase C Current Range
Desired Current Range
Phase C Voltage Amplitude
100%
Phase C Current Amplitude
100%
Phase C Voltage Angle
240°
Phase C Current Angle
240°
Phase C Voltage Harmonics
OFF
Phase C Current Harmonics
OFF
GENERAL
Flicker
OFF
Power Direction
SOURCE
Line Frequency
Desired Frequency
Power
ON
Simulations
Power Reversal
Verify the Power Quality instrument connected to the simulator is programmed to
record power in a 4-wire wye 3-wattmeter configuration.
Method # 1 Real Time Demand DVM Screen
1. Verify the controls are set to their initial settings.
2. View the real time demand (DVM screen) and note the KW is positive.
3. Set the Power Direction switch on the PQ Simulator to Sink.
4. The KW now reads negative. This indicates a reversal of power.
NOTE:
The current vectors are now 180
°
out of phase with the voltage. Current
vectors should never exceed 90
°
of the voltage. If the current does exceed
90
°
of the voltage angle then this indicates a reverse power flow.
Summary of Contents for MPQSIM
Page 2: ......
Page 3: ...MPQSIM User Manual...
Page 8: ...M AVTMMPQSIM Rev 1 May 2017 2 M...
Page 10: ...M AVTMMPQSIM Rev 1 May 2017 4 M...
Page 20: ...M AVTMMPQSIM Rev 1 May 2017 14 M...
Page 36: ...M AVTMMPQSIM Rev 1 May 2017 30 M...