BITE / POWER DB
AVTM82318 REV 1 April 17, 2012
Page 40
The new baseline value shall now be displayed. (This value is calculated by averaging
all the cells together then discarding any cells values that are more that 5% from the
average. Then the average is recalculated. This process id continued until all the cell
values used are within 5% of the calculated average. This value is now the baseline
value.)
SECTION 6.8: INPUTTING A NEW BATTERY BASELINE VALUE
Create a battery report.
www.actoolsupply.com
www.actoolsupply.com