
Figure 25. Surge test results screen.
Basic Testing Procedures
Baker DX Series Static Motor Analyzer
www.megger.com
18
Figure 24. Ramp rate and waveform zoom popup menu.
6. Use the
Fast/Slow Ramp
Rate icons to control the rate of voltage change while turning the
Voltage Output Control
knob clockwise to raise the voltage to the desired test level. Release
the knob when the test voltage is reached.
7. Use the
Surge waveform zoom
icons to adjust the time display scale of the surge waveform.
8. Release the
PTT
button after the desired number of surge pulses have been applied at the
target test voltage level.
9. If the winding is a wye or delta configuration, select lead 2 and repeat Steps 5–8 then repeat for
lead 3.
NOTE
To facilitate comparison of leads, you will not be able to select different time
scales for leads 2 and 3.
10. The results of the winding tests of a wye or delta configuration will appear, as shown below.
Save your results at this time. Performing subsequent surge tests will overwrite the displayed
results.