background image

GENERAL SAFETY INSTRUCTIONS

SAFETY RULES FOR THE INSTALLER  

 •

WARNING! In order to ensure personal safety, it is important to follow all instructions carefully. Improper installa

-

tion or improper use may result in serious personal injury.

 •

This installation manual is an integral part of the product and must be delivered to the user. Keep this installation 

manual and all information material.

 •

This product has been designed and built exclusively for the use indicated in this manual.

 •

Any application not indicated could be harmful to the equipment and/or represent a source of danger.

 •

To ensure proper operation of the mechanism and an adequate degree of safety, use only original spare parts, 

accessories and fixtures.

 •

Do not install the device in an explosive atmosphere. The presence of flammable gases or fumes implies a seri

-

ous safety hazard.

 •

The mechanism has a torque and anti-crush controller in the BACN version. However, other safety devices (e.g., 

photocells, sensitive strips, etc.) must also be installed to prevent dangers arising from moving mechanical ac

-

tions (crushing, dragging, shearing).

 •

For each installation it is necessary to use at least one light-signalling device, as well as a sign correctly attached 

to the gate structure.

 •

Installation, electrical connection, adjustments and maintenance of the appliance must be carried out exclusively 

by professionally qualified technical personnel. Wrong installation or improper use of the product can cause seri

-

ous damage to people or property.

 •

Always install a differential with a value of 0.03 A. and a thermomagnetic switch with an opening of the contacts 

of at least 3 mm provided with overload and short circuit protection.

 •

Connect the yellow-green ground cable to the terminal marked with the symbol on the control panel, the safety of 

this appliance is guaranteed only when the mechanism is connected to a proper ground installation according to 

the applicable regulations.

 •

The mechanism must not be put into definitive operation before all the connections have been made, the effi

-

ciency of the safety devices controlled and the pushing force configured to the minimum, in compliance with the 

regulations in force concerning automatic doors (Directive 89/392 and standards EN 12453 and EN 12445).

 •

Ensure gate structure is solid, balanced and suitable to be activated, ensure that the gate does not have friction 

points during its movement

SAFETY RULES FOR THE USER

 •

In case of malfunction, do not attempt to repair and contact a specialist technician.

 •

Do not allow children or pets to approach the gate. Never let children stand or play with gate controls. Keep re

-

mote controls away from children and users who are not authorized to operate them; keep controls where unau

-

thorized users or children cannot access them.

 •

In the event of a power failure or emergency, you must know how to release the gate to be able to manipulate it 

manually.

 •

Please keep these safety instructions. Please make sure everyone who uses or is near the gate is aware of the 

hazards related to automatic gates. If you sell the property with the gate mechanism or sell the mechanism sepa

-

rately, please provide the new owner with a copy of these safety instructions.

2 of 11  

Summary of Contents for HLR240 BAC-1.3

Page 1: ...INSTRUCTION MANUAL AUTOMATIC GATE MECHANISM HLR240 BAC 1 3 HLR360 BAC 1 3 Ed2 27 08 18...

Page 2: ...r of which it will be a component has been identified and declared to comply with the terms of Directive 2006 42 EEC and subsequent amendments We put the CE conformity marking on the machine Plate num...

Page 3: ...s install a differential with a value of 0 03 A and a thermomagnetic switch with an opening of the contacts of at least 3 mm provided with overload and short circuit protection Connect the yellow gree...

Page 4: ...50 bar Rod stroke length 242 mm 362 mm Closing manoeuvre time 20 s 31 s Opening manoeuvre time 17 s 26 s Closing force 637 Kg Opening force 508 Kg Maximum gate length 4 m 6 m Temperature range 15 to 8...

Page 5: ...ning and closing Ti time between complete manoeuvres opening closing Graph 1 Note To ensure the full closing and opening of the gate it is necessary to increase the manoeuvring times by 5 sec onds The...

Page 6: ...800KG HLR 240 110 HLR 360 115 HLR OPENING INWARDS Fig 2 M A B C 85 195 185 90 90 180 180 90 95 165 180 90 100 150 180 90 105 140 180 90 110 125 180 90 115 115 180 90 120 105 180 90 OPENING OUTWARDS Fi...

Page 7: ...vertical line as possible Dimension C remain constant in both motors model 360 C 90 mm and model 240 C 70 mm Example What would be the dimension A and what engine should I use to automate a gate with...

Page 8: ...ASSEMBLY INSTRUCTIONS 7 of 11 Fig 1 Fig 2 Fig 3 Fig 4 Fig 5 Fig 6 Fig 7 Fig 8 Fig 9 Fig 10 Fig 11 Fig 12 Fig 13 Fig 14 Fig 15...

Page 9: ...tion move the ring at the end of the stroke on the rod Fig 9 page 7 to the telescopic bushing Fig 10 page 7 and attach it with the allen screw Now we can activate the motor electrically Reposition the...

Page 10: ...e RED BLUE View of the motor from below LOCKING OPERATION The BAC system incorporated in the HLR device offers a wide variety of possibilities Here is how it should be manipulated to get the most out...

Page 11: ...h and it is not an obstacle that must be released In order to be able to do without a limit switch when opening it is necessary for the panel to have the option that when the gate is opening and finds...

Page 12: ...Kit and Gate supp 240 A232 11001 K1 Pillar supp Kit and Gate supp 360 A232 11002 K1 21 Hydraulic lock A232 21002 00 22 Hydraulic hose in metres 80736 23 Hose assembly kit A232 22003 K1 No NAME Ref 1...

Reviews: