27
www.mediclinics.com
4
ENGLISH
INSTALLATION
Mounting
Relative movement base-cover
Most sensitive components
Base-cover fastening clips details
Electronic circuit
IR Sensors screen
Cover
Fastening clips
IR Sensors
Assembly process
Dismantling for installation
The removal of the cover of the dryer must be carried out by releasing the cover fastening clips located on top
of the said cover. In order to do this, please displace the cover downwards in the horizontal plane and then
extract it vertically.
Whilst carrying out that process, please avoid:
Damaging the internal components, especially the IR sensors of the electronic circuit.
Scratching the cover and the IR sensors screen.
It is suggested that the electrical installation of the appliance is carried out
through the rear canalization.
The terminal strip where the electrical supply cables will be accommodated
as well as their access hole (Ø22 mm Ø 0.87 ) are put up in the right-hand
side of the dryer.
This dryer is a class II appliance and does not require grounding.
The installation process can be summarized as follows:.
1.Make the 4 Ø6 mm (Ø 0.24) drill holes with the help of the template
provided. Clean the holes of the resulting dust. Introduce the 4 wall plugs
provided until they are at walls level.
2.Pass the electric cables that come from the wall through the access hole
(Ø22 mm Ø 0.87 ).
3.Screw the 4 lag screws provided firmly fixing the base of the dryer to the
wall.
4.Connect the electric pair to the terminal strip.
5.Fit the cover of the dryer.
- Introduce the cover from the front
- The base clips will fit into their respective accommodations on the cover.
- Move the cover upwards.
- Introduce and fix the 2 lower screws with the help of the special key.
CE / VDE GS / VDE EMC / AENOR / GOST
M04A / M04AC / M04ACS