
6-12
2.
Adjustment of the clearance between the machine and the coolant tank
In order to prevent water leakage, adjust the leveling bolts so that the clearance between the
machine and the coolant tank is approx. 15 mm.
Note :
If this adjustment is neglected, water leakage may be caused.
15mm
Fig. 6-1 Adjustment of the clearance between the machine and the coolant tank
3.
Checking interconnections
After temporary leveling is finished, check and confirm the following items before switching the
power on.
•
Grounding (class 3 grounding work)
Class D (formerly class 3) grounding requirements
•
Screws at terminals (must be tight)
•
Connection of cannon connectors and other connectors
•
Relays (must be fitted and connected correctly)
4.
Final level adjustment
After the second stage concrete has solidified, adjust the machine level using the leveling bolts.
Place precision levels on the upper surface of the table.
Precision level accuracy: 0.02 mm (0.00079 in.)/division
For details of the procedure to adjust the machine level and allowable leveling error, refer to our
CERTIFICATE OF THE MACHINE ACCURACY supplied with the machine.
After tightening the leveling nuts and foundation bolts, check the machine level again.
Return to Library
Summary of Contents for VTC-160A
Page 2: ...Notes Return to Library...
Page 20: ...Notes Return to Library...
Page 54: ...4 20 MEMO Return to Library...
Page 61: ...5 7 5 4 3 Hydraulic Circuit Diagram Return to Library...
Page 74: ...5 20 MEMO Return to Library...
Page 82: ...6 8 Machine body Fig 6 1 Lifting the Machine Return to Library...
Page 96: ...7 4 MEMO Return to Library...