background image

13

Preoperational Test _____________

All dryers are thoroughly tested and inspected before leaving 

the factory. However, a preoperational test should be performed 

before the dryer is publicly used. It is possible that adjustments 

have changed in transit or due to marginal location (installation) 

conditions.
Turn on electric power to the dryer.
Refer to the operating instructions for starting your dryer.
Open all shutoff valves.
When a gas dryer is first started (during initial start-up), it has 

a tendency not to ignite on the first ignition attempt. This is 

because the gas supply piping is filled with air, so it may take a 

few minutes for the air to be purged from the lines.

NOTE:

 During the purging period, check to be sure that all gas 

shutoff valves are open.

Tumbler Coating

The tumbler is treated with a protective coating. We suggest 

dampening old garments or cloth material with a solution of 

water and nonflammable mild detergent and tumbling them in 

the tumbler to remove this coating.
Each tumbler should be operated through one complete cycle 

to ensure that no further adjustments are necessary and that all 

components are functioning properly.

Microprocessor Programs / Selections

Each microprocessor controller (computer) has been pre 

programmed by the factory with the most commonly used 

parameter (program) selections. If computer program changes 

are required, refer to the computer programming manual, which 

was shipped with the dryer.

Operating Instructions __________

The dryer is available for use when the appropriate side of the 

microprocessor display reads “0 minutes” and the amount 

needed to start the dryer (i.e., “25”). Once the load has been 

put into the dryer and the main door is closed, start the dryer as 

follows:

 

͜

Insert the proper number of coins into the coin acceptor. 

Once the correct “Amount To Start” has been inserted, the 

display will read “SELECT CYCLE”.

 

͜

Determine fabric setting (selection). 

Once the fabric temperature setting (selection) has been 

determined, start the dryer by pressing the fabric setting 

key.

 

͜

The dryer will now start, and the display will read the setting 

and the time vended.

 

͜

The cycle time will count down until the drying and cooling 

cycles are completed.

 

͜

Upon completion of the drying and cooling cycles, the dryer 

will shut off.

The dryer tumbler can be stopped at any time by opening the 

main door. Do not reach into the dryer if the drum is moving. To 

restart dryer, shut the main door and press desired setting.

NOTE:

 When a cycle is interrupted by opening the main door, 

cycle time will continue to count downward, regardless if the 

door is open or closed.
Selection (setting) changes can be made at any time during the 

drying cycle.

Shutdown Instructions __________

If the dryer is to be shutdown (taken out of service) for a period 

of time, the following must be performed:
Disconnect power to the dryer either at the external disconnect 

switch or the circuit breaker.
Disconnect the fuel supply: close external gas shutoff valve. 

Also close two internal gas shutoff valves.
If the dryer is to be removed from service or discarded, before 

doing so remove the door to the drying compartment.

Summary of Contents for MLG30

Page 1: ...MLG30 Installation Manual Stack Dryer WFR113543E RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE...

Page 2: ...N HAZARD Failure to follow safety warnings exactly could result in serious injury death or property damage Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or...

Page 3: ..._ HVAC Heating Ventilating and Air Conditioning in WC Inches of Water Column UL Underwriters Laboratory NPT National Pipe Thread Table Of Contents ______________ Caution Label all wires prior to disco...

Page 4: ...kg APPROXIMATE SHIPPING WEIGHT 710 lb 322 kg AIRFLOW PER POCKET 400 cfm 11 3 cmm HEAT INPUT PER POCKET 72000 Btu hr 18143 kcal hr EXHAUST CONNECTION DIAMETER 8 20 3 cm INLET PIPE CONNECTION PER POCKE...

Page 5: ...nform to applicable Canadian Standards CAN CGA B149 1 M91 Natural Gas or CAN CGA B149 2 M91 Propane Gas or LATEST EDITION for General Installation and Gas Plumbing The operation of this dryer may affe...

Page 6: ...r 1 000 Btu 252 kcal It is not necessary to have a separate make up air opening for each dryer Common make up air openings are acceptable However they must be set up in such a manner that the make up...

Page 7: ...elbows used exceeds the above noted specifications the cross sectional area of the ductwork may need to be increased IMPORTANT For extended ductwork runs the cross section area of the ductwork can onl...

Page 8: ...RICAL SERVICE SPECIFICATIONS PER POCKET NOTES A When fuses are used they must be dual element time delay current limiting class RK1 or RK5 ONLY Calculate determine correct fuse value by applying eithe...

Page 9: ...onnection wiring must be sized properly to handle the dryer s current draw This information is printed on the dryer s data label Fire Hazard Use appropriate gauge of copper wire See chart in Electrica...

Page 10: ...country of destination and if in doubt the installer must contact the supplier The manufacturer of this dryer does not recommend the use of flexible gas supply line hose Pipe joint compounds that res...

Page 11: ...immediately upstream of the dryer Test all connections for leaks by brushing on a soapy water solution liquid detergent works well 3 4 x 1 2 x 1 2 TEE 19 05 mm x 12 7 mm x 12 7 mm SEE IMPORTANT NOTE...

Page 12: ...ry adjustments have been made the dryer must be operated in a heating cycle to verify that the pressure is correct 6 Feed manometer hose through an opening in the back panel while reattaching the back...

Page 13: ...uctions __________ The dryer is available for use when the appropriate side of the microprocessor display reads 0 minutes and the amount needed to start the dryer i e 25 Once the load has been put int...

Page 14: ...y lint buildup Suggested Cleaning Schedule Every Third or Fourth Load Clean the lint screen every third or fourth load A clogged lint screen will cause poor dryer performance The lint door drawer is l...

Page 15: ...Gives the number drill size used 6 Electric Service This describes the voltage and current rating for a particular model 7 Gas Manifold Pressure For Gas Dryers This describes the manifold pressure ta...

Page 16: ...MLG30 Manuel d installation S cheuse superpos e CONSERVER CES INSTRUCTIONS POUR R F RENCE ULT RIEURE...

Page 17: ...ce ou d autres vapeurs ou liquides inflammables proximit de cet appareil ou de tout autre appareil lectrom nager QUE FAIRE DANS LE CAS D UNE ODEUR DE GAZ Ne pas tenter d allumer un appareil Ne pas tou...

Page 18: ...on et Climatisation po CE Pouces de colonne d eau UL Underwriters Laboratory NPT National Pipe Thread Attention Lors des contr les d entretien placer des tiquettes sur l ensemble des c bles avant leur...

Page 19: ...UEMENT APPROXIMATIF 710 lb 322 kg D BIT D AIR PAR S CHEUSE 400 pi min 11 3 m3 min ENTR E DE CHALEUR PAR S CHEUSE 72 000 Btu h 18 143 kcal h RACCORD D VACUATION DIAM TRE 8 po 20 3 cm RACCORD D ENTR E D...

Page 20: ...z naturel ou CAN CGA B149 2 M91 gaz propane ou la DERNI RE DITION pour l installation g n rale et la plomberie au gaz L utilisation de cette s cheuse peut affecter celle d autres s cheuses gaz dont la...

Page 21: ...uverture d air d appoint distincte pour chaque s cheuse Les ouvertures communes pour l air d appoint sont acceptables Toutefois elles doivent tre install es de sorte que l air d appoint est distribu u...

Page 22: ...onduit IMPORTANT Pour les conduits de longueur prolong e l aire de la section transversale du conduit ne peut tre augment e que dans une certaine mesure Lorsque le nombre de conduits approche les limi...

Page 23: ...fusibles sont utilis s ils doivent comporter deux l ments tre temporis s de type limiteur de courant classe RK1 ou RK5 UNIQUEMENT Calculez d terminez la bonne valeur de fusible conforme aux codes lec...

Page 24: ...du circuit de 120 V 15 A au conducteurs restants s cheuse inf rieure comme d crit dans l illustration suivante noir noir blanc blanc et vert au fil de terre du ch ssis Serrer les vis du r ducteur de t...

Page 25: ...heuse l usine Le r glage ou la conversion des s cheuses sur le terrain pour des altitudes sup rieures 2 000 pi 610 m est effectu en changeant chaque orifice du br leur Si cette conversion est n cessai...

Page 26: ...les raccordements pour la pr sence des fuites en appliquant une solution d eau savonneuse le d tergent liquide fonctionne bien RACCORD EN T DE 3 4 po x 1 2 po x 1 2 po 19 05 mm x 12 7 mm x 12 7 mm VO...

Page 27: ...ns le sens antihoraire pour abaisser la pression REMARQUE La pression de sortie est mesur e pendant que le br leur est en marche pour toutes les conditions de r glage du br leur Par cons quent une foi...

Page 28: ...fi s en cours de route ou en raison de conditions d emplacement marginales installation Mettre sous tension la s cheuse Voir les instructions d installation pour mettre la s cheuse en marche Ouvrir to...

Page 29: ..._________________ R paration La r paration doit tre effectu e par un technicien ou une entreprise de r paration ayant les qualifications requises ou par le fournisseur de gaz Si une r paration est n c...

Page 30: ...VEC DES ELEVATIONS ENTRE 610 A 1372M Assembled in Assemble aux USA Whirlpool Corporation TEL 269 923 3000 88 Currant Road FAX 508 678 9447 Fall River MA 02720 4781 mdl service whirlpool com WWW WHIRLP...

Page 31: ...31...

Page 32: ...WFR113543E 03 20 TM 2020 Maytag All rights reserved Tous droits r serv s...

Reviews: