11921 Sl
auson
A
ve
. Sa
nt
a Fe
Spri
ngs, C
A. 90670 (800) 22
7-41
16 F
AX
(88
8)
771-7713
57
STEP 13 - FINISH WELDING LIFTGATE TO VEHICLE
MOUNTING PLATE
FIG. 57-1
TYPICAL - BOTH
MOUNTING PLATES
VEHICLE FRAME
(TYPICAL TRUCK FRAME
SHOWN)
Weld each of the two mounting plates to
main frame and vehicle frame
(FIG. 57-1)
.
1/4”
Prevent damage to hydraulic hoses. Before welding next to hydraulic hoses,
protect the hoses with a heat-resistant cover such as a welding blanket.
CAUTION
To protect the original paint system if equipped, a 3” wide area of paint must
be removed from all sides of the weld area before welding.
CAUTION
`
Welding on galvanized parts gives off especially hazardous fumes. To mini
-
mize hazard remove galvanizing from weld area, provide adequate ventilation,
and wear suitable respirator.
WARNING
!
1/4”
MAIN FRAME
Summary of Contents for 72-150
Page 69: ......