APPLIANCE INSTALLATION
4
4.1
UNPACKING THE APPLIANCE
The appliance is supplied in one box. Flue kits ar
e provided
separately, the various flue kits available are described in section
2.5. If the appliance is to be installed without access to an
external wall, a wall liner kit is also required.
Unpack the boxes and check the contents:
●
Complete appliance
●
Paper wall mounting template
●
W
all mounting plate
●
Installation and Ser
vicing Instruction
●
User’
s Instructions
●
Har
dware pack containing:
6 x 65 mm wood screws – 2 off
Blue wall plugs – 2 off
Flue seal
Before installing the appliance, check that the chosen location is
suitable (section 3.2) and that the requirements for flue position
(section 3.3) and minimum clearances (Fig. 1) are satisfied.
Manual Handling Note:
During the appliance
installation it will be necessary to employ caution and
assistance whilst lifting, as the appliance exceeds the
recommended weight for a one-man lift. Take care to
avoid trip hazards, slippery or wet surfaces.
4.2
PREPARING THE WALL
a)
Fix the paper template in the r
equired position (ensuring that the
necessary clearances are observed). Ensure squareness by hanging
a plumb line.
b)
Mark the position of the lar
gest wall fixing holes. Refer to Fig. 9.
c)
Mark the position of the flue outlet. For side flue installation
extend the flue centre line on to the sidewall, where the flue length
exceeds 775 mm, a flue slope angle of 2.5
º
needs to be taken into
account. Refer to Fig. 10. Remove the paper template.
d)
Cut the hole in the wall for the air/flue duct (pr
eferably with a
core-boring tool). The hole must be horizontal and not be less than
100 mm in diameter. If the hole is not accessible from outside, its
minimum diameter must be sufficient to allow insertion of the wall
liner (130 mm, 5
1
⁄
8
in). The wall liner is available as an optional
extra and must be sealed in position with mortar (or equivalent).
e)
Drill the two lar
gest fixing holes using a 10mm drill and insert the
blue wall plugs provided. (Ensure the provided wall plugs are suitable
for the wall to be fixed to, if not, use suitable wall plugs). Further
holes can then be drilled should additional support be required for
the boiler. Screws and wall plugs are not supplied for this.
f)
Hang the wall mounting plate using the two lar
ge fixing screws
supplied, ensuring that it is level. Refer to Fig. 9.
g)
Fit any additional fixing scr
ews into wall plugs and tighten all
screws.
As standard the pipe work may only be routed
from below.