
DBF01O04.docx
(MAVIG #7111730)
page 19 of 22
Install the middle plate:
Cut the
tubes (5)
to the length
b at one end only
.
DON’T burr the tubes!
Cut each of the
long M16 threaded rods (4)
to the length
L1 at one end only
.
Burr max. 2mm
the cut ends of the threaded rods.
Make sure that
all threads
are
not damaged or dirty
.
Screw hexagon nuts (3 / 9) ca. 5cm onto
both ends
of each threaded rod.
Place a
washer (2)
on top of each nut at the uncut ends of the threaded rods.
Apply Loctite 270
to the uncut ends of the threaded rods.
Screw the uncut ends
of the threaded rods
fully
into the ceiling plate (1)
Secure each threaded rod with the preassembled hexagon nut to the ceiling
plate.
Make sure there’s still enough Loctite 270 on the rods for the nuts.
Make sure there’s a washer between every nut and the ceiling plate.
Apply Loctite 270
to the lower ends of the threaded rods.
Place one
tube (5)
and a
washer (2)
(6x) and the
middle plate (6)
on the
threaded rods (4)
and secure each with a hexagon nut (3) from below.
Make sure there’s still enough Loctite 270 on the rods for the nuts.
Make sure there’s a washer inside every tube resting on the middle plate.
The
hexagon nuts (9)
are used to secure the
washers (2)
in a position near
the middle plate. They can’t be tightened.
Make sure that even after tightening there will be min. 5mm space
between the lower washers and the nuts (9)!
Tighten the hexagon nuts (3) to the middle plate from below.
Install the interface plate:
Make sure that
all short M16 threaded rods (7)
are
not damaged or dirty
.
Screw hexagon nuts (3) ca. 5cm onto both ends of each threaded rod.
Apply Loctite 270
to both ends of the threaded rods.
Insert the threaded rods to the middle plate (6) and tighten them from above
and below with a
hexagon nut (3)
.
Push the
interface plate (8)
up to the required height on the threaded rods and
secure from beneath with
hexagon nuts (2)
Adjust the height and level alignment of the interface plate
Tighten the hexagon nuts to the interface plate from above and below.
NOTE:
Every M16 hexagon nut
, including the ceiling plate securing nuts,
must be tightened with
200 Nm (±3%) torque
and secured with
Loctite 270
!
After tightening,
mark each nut with seal paint
from the nut to the
plate.
Also
mark each tube with seal paint
from its end to the ceiling
plate and the middle plate
NOTE:
During installation, use a spirit level (accuracy: 1mm/m) to make
sure that the middle plate and interface plate are horizontally
aligned.