
DBF01O04.docx
(MAVIG #7111730)
page 18 of 22
3.4.3 GD60D032
NOTE:
Use this configuration only, if the distance between the concrete
and lower face of the false ceiling is
610mm –
1115mm.
Calculating the length of the threaded rod (L1) and the tube (b):
a: min. 145mm – max.155mm
b: distance between ceiling plate and middle plate =
length of the tube
c=distance from concrete ceiling to lower face of false ceiling;
must be measured!
Cut
L1 to c – 115mm / Tolerance: +10mm/-0mm
Cut
b to c – 175mm / Tolerance: ±1mm / ±0,5°
Fig. 15