Operation
Page 11 of 27
11. If your grass collection implement has an electric changeover valve, connect the plug
to the towing vehicle.
12. Mount the universal shaft as shown as described in chapter 5.4.
5.3
Detaching the material collection system from the rear three-
point linkage
Danger!
If you do not comply with the following instructions the implement can tip
over when it is being detached:
Place the material collection implement on a level and solid substrate.
Only detach the material collection system if the collection container is
empty, closed and lowered.
Proceed as follows to detach the implement from a three-point linkage:
1.
Turn the casters to the rear and secure them with the arrest bolts (see Fig. 1: Arrest
bolts)
2.
Crank the support wheel downward and secure support wheel with the securing
bracket (see Fig. 2: Lower link bolt)
3.
Disconnect the hydraulic hose connections.
4.
Unplug the plug connector from the tractor's power connection.
5.
Uncouple the universal joint shaft from the tractor.
6.
Unhook the lower link and top link.
5.4
Mounting and adjusting the universal joint shaft
Attention!
The universal joint shaft is especially adapted to the vehicle and the material
collection system. At first use, always check, as described in this chapter,
whether it has been adapted!
If not, adjust the universal joint shaft, as described in the original operating
manual of the universal joint shaft, attention!
To prevent the PTO shaft brake from being damaged, we recommend a
universal joint shaft with freewheel element.
To check whether the universal joint shaft is the correct length for your vehicle you must attach
the material collection system on the three-point linkage. In this regard, proceed as described
in
Summary of Contents for CLS-G/H 1050
Page 20: ...Maintenance Page 20 of 27 ...
Page 22: ...Maintenance Page 22 of 27 ...