Mass Sine Ultra
– Installation Manual Multiple Units
Parallel configuration with MasterAdjust
9
In the device list, in the left pane of MasterAdjust, the Replica unit(s) will now be listed under the Primary unit.
3.7
Initial start-up
1. Switch all units off and on again.
2. Check that the units are working as inverter.
3. Close the AC breaker in the Mains Input of each unit.
4. Check that the units are working as charger when 230V
AC
is applied to the Mains Inputs.