27
www.mastercool.com
3.
Verify the high and low side system pressures. Press next to continue.
4.
Turn off the vehicle and allow the AC system pressures to equalize.
5.
Close and remove the high side coupler. Press next to continue.
6.
Start the vehicle, turn the AC system on high. Press next.
7.
Open the valves on the machine. Press next.
8.
Allow the AC system pressures to equalize. Press next
9.
Close and remove the low side coupler, turn off the vehicle. Press next.
10. Hose clearing will be displayed. The tank graphic with weight will be displayed. The tank pressure
and temperature will be displayed.
11. The machine will recover any residual refrigerant and ready itself for the next vehicle.
12. Process Completed, will be displayed when finished.
*NOTE: The COMMANDER4000/COMMANDER4000-X does not have oil inject
Summary of Contents for COMMANDER4000
Page 2: ......