background image

Generation II Entree Bath 

 

All Models 

INSTALLATION MANUAL 

06-23-17 

Page 8 of 11

2071 14

th

 Ave – Columbus, NE 68601 

 800-798-5867  FAX: 402-563-9102 

www.mastercarebath.com

Casual Water Drain 

Connection in the Door

 

Casual Water Drain 

Connection to the 

Drain Pipe

 

13.

Tighten the hose clamps on the rubber couplers.

14.

Anchor the tub to the wall in two places with the anchor kit provided in the Entree Gen II Starter Kit box.

 Select

the two stud locations as far apart as possible along the rear wall flange of the tub. Center on each stud using

the finishing washer in the kit and hold it just below the 

black trim seal to mark the anchor hole location. Drill 

3/16” holes  at  the  marked  locations  through  the 

flange only. Anchor  tub to wall with the #  10  x 3” SS 

flat head self tapping anchor screws. You will need a # 

2 sq. drill bit for this. If it is a masonry wall, installer is 

responsible to select appropriate anchors.  

15.

Proceed to the Gen II Entree Bath Operation Manual.

16.

Go through a bath cycle and verify all functions work

correctly.

17.

Make sure that when the fill knob is in the hot position, hot water comes out of the valve.

  Check the water

temperature and verify it is in the proper range. Rotate the knob to mid range and verify the temperature "tracks

the knob" and reduces accordingly.

Note: If the hoses are connected backwards, the mixing valve will not function correctly.

18.

Check the GFCI,

 located under the head end raised panel, and make sure it trips and resets properly.

19.

Make sure the tub is grounded according to code.

20.

Make sure the Casual Water Drain (located in the back side of the tub) is properly connected.

Tub

 

Anchor 

Screw

 

Finishing 

Washer

 

Tub Wall 

Flange

 

Black Trim 

Seal

 

Wall

 

Stud

 

Summary of Contents for Entree Gen II

Page 1: ...uctions thoroughly CAUTION The caution heading identifies important maintenance and operation information Failure to obey a caution warning may result in damage to the Entree Bath and may void the warranty Note The serial tag is at the first page of this manual package The Standards and certification labels are located in the Architectural Specifications Rough In Information ...

Page 2: ...2071 14th Ave Columbus NE 68601 800 798 5867 FAX 402 563 9102 www mastercarebath com 06 23 17 Page 3 of 11 This page is intentionally left blank ...

Page 3: ...5 Laboratory Faucet Vacuum Breakers Fill 1 5 A gap above rim complies with National Plumbing Standards See plumbing standards below Note The factory provided backflow prevention is the most widely accepted Local codes may require changes The local plumbing contractor is responsible for any changes BathAire SM Outlets 4 with 12 ports each for a total of 48 warm air massage outlets Door Seal Seal ce...

Page 4: ...schedule 40 pipe DO NOT Hard Plumb for ease of accessibility for servicing Water Connection SS braided flex hose with female pipe thread connections Water Supply hot and cold with shut offs Hot and cold water pressure 45 90 psi Hot water temperature to be 120º F and cold water 59º F Weight 500 lbs Fill Rate In excess of 17 GPM provided that the water lines are water pressure is at least 60 psi and...

Page 5: ...372 ASSE 1035 Laboratory Faucet Vacuum Breakers Fill 1 5 a gap above rim complies with National Plumbing Standards See plumbing standards below Note The factory provided backflow prevention is the most widely accepted Local codes may require changes The local plumbing contractor is responsible for any changes BathAire SM Outlets 4 with 12 ports each for a total of 48 warm air massage outlets Door ...

Page 6: ...le 40 pipe DO NOT Hard Plumb for ease of accessibility for servicing Water Connection SS braided flex hose with female pipe thread connections Water Supply hot and cold with shut offs Hot and cold water pressure 45 90 psi Hot water temperature to be 120º F and cold water 59º F Weight Approximately 500 lbs Fill Rate In excess of 17 GPM provided that the water lines are water pressure is at least 60...

Page 7: ...carebath com BEFORE STARTING TOOLS NEEDED FOR INSTALLATION ENTREE LOCATION REFERENCE Tape Measure Adjustable Wrench Adjustable Pliers 2 Phillips Screwdriver 5 16 Nut driver Channel Locks 1 2 Socket and Ratchet Back of Tub Front of Tub TOP VIEW OF TUB Foot End Foot End Controls Plumbing Assembly Emergency Wrench Access Panel GFCI Access Panel Head End ...

Page 8: ... tub and close the door halfway by depressing the Door Close button located on the Foot End Control Panel Locate the two lag screws by looking through the service hole located on the backside of the tub Detail 3 Proceed to remove the two lag screws discarding board g Remove the four 4 screws from each of the anchoring plates Detail 2 h The Entree Bath can now be lifted off of the pallet The Entree...

Page 9: ...GHT DAMAGE IF DAMAGE IS FOUND IT MUST BE REPORTED COMMUNICATED AND DOCUMENTED IMMEDIATELY TO THE FREIGHT COMPANY AND MASTERCARE REMOVE 2SCREWS FROM COVERPANEL REMOVE 4 SCREWS FROM EACH TUB PALLET ANCHOR PLATE WITH A 2 PHILLIPS ENTREE TUB CRATE REMOVAL REMOVE 10 LAG SCREWS FROM BOTTOM OF CRATE WITH A 1 2 SOCKET 1 4 BACK SIDE OFTUB 3 TOP VIEW LOOKING DOWN REMOVE 2 LAG SCREWS THROUGH ENTREE SERVICE H...

Page 10: ...y the installing contractor 2 All drain connecting parts supplied by the contractor must meet National and State Plumbing Codes 3 If floor sink used it must be at least three inches in diameter 4 If rubber coupler does not meet code use any type of detachable coupler that meets code to allow drain assembly to be uncoupled so tub can be slid out for service B Wall Drain Option A Floor Drain Option ...

Page 11: ...SS flat head self tapping anchor screws You will need a 2 sq drill bit for this If it is a masonry wall installer is responsibletoselect appropriateanchors 15 Proceed to the Gen II Entree Bath Operation Manual 16 Go through a bath cycle and verify all functions work correctly 17 Make sure that when the fill knob is in the hot position hot water comes out of the valve Check the water temperature an...

Page 12: ...6 for XL length WALL TUB C L 120V AC 60 Hz 20 amp SERVICE 2X4 ELECTRICAL BOX WITH DUPLEX RECEPTACLE FLUSH MOUNTED IN WALL GFCI already installed on tub 35 Center Line for XL Tubs MPT 3 4 SHUTOFF WITH 3 4 MPT FROM WALL FOR CONNECTION TO HIGH PRESSURE HOSES FROM THE MIXING VALVE ON TUB DECK 4 12 17 22 20 22 1 25 REQUIRED 2 FLOOR DRAIN LOCATION CENTERED EQUAL DISTANCE FROM THE SIDES OF THE TUB LOCATI...

Page 13: ...d to cover opening at the back of the tub 20 15 COLD 20 HOT 1 625 3 ON BOARD GFCI LOCATED UNDER THIS PANEL ON BOARD GFCI LOCATED UNDER THIS PANEL 3 4 HOT COLD SERVICES AT THESE LOCATIONS WITH 3 4 BALL VALVES FOR A TOTAL OF 12 ABOVE THE FLOOR WITH VALVE HANDLES LOCATED AS SHOWN 120V 60 Hz 20 Amp SERVICE 2x4 ELECTRICAL BOX WITH DUPLEX RECEPTACLE FLUSH MOUNTED IN WALL GFCI ALREADY INSTALLED ON THE TU...

Page 14: ...8 W x 46 H 3 Head End Corner Placement MB 68 AVH 36 D x 62 W x 46 H MB 68 AVH XL 36 D x 68 W x 46 H 4 Alcove Placement MB 59 AV 36 D x 59 W x 46 H MB 59 AV XL 36 D x 65 W x 46 H Finished Alcove opening must be a minimum of 60 for Standard length and 66 for XL length 6 Head End Peninsula Placement MB 68 AVH 36 D x 62 W x 46 H MB 68 AVH XL 36 D x 68 W x 46 H Requires Back Door Panel 7 Island Placeme...

Reviews: