Generation II Entree Bath
–
All Models
INSTALLATION MANUAL
06-23-17
Page 7 of 11
2071 14
th
Ave – Columbus, NE 68601
800-798-5867 FAX: 402-563-9102
www.mastercarebath.com
5.
Flush line into a bucket
and verify hot water comes from that hose. After flushing, attach tub hose with red
marking.
6.
Make sure the screen is in the hose.
7.
Connect a flexible hose to the hot water supply valve.
8.
Flush hose into a bucket
and verify cold water comes from hose. After flushing, attach tub hose with blue marking.
Note: The mixing valve will not perform correctly if those hoses are connected backwards.
9.
Make sure the screen is in the hose.
10.
Connect a flexible hose to the cold water supply valve.
11.
Turn on the hot and cold supply valves slowly
and verify there are no leaks.
12.
Place the tub in the final desired location and connect the drain tubing
as shown in the following figure.
Note: The "U" section must be installed "low profile" so that it will clear the tub door when in open position. The reason
for the "U" configuration is for ease of disconnection in the event the tub needs to be slid out for service.
MEMO:
1.
Parts shown in the top view of
this suggested layout are to be
supplied by the installing
contractor.
2.
All drain connecting parts
supplied by the contractor
must meet National and State
Plumbing Codes.
3.
If floor sink used, it must be at
least three inches in diameter.
4.
If rubber coupler does not
meet code, use any type of
detachable coupler that meets
code to allow drain assembly
to be uncoupled so tub can be
slid out for service.
B
Wall
Drain
Option
A
Floor
Drain
Option
40
1
/
2
"
Re
ar
W
al
l
Casual Water
Drain Hose
19"
SIDE VIEW OF DRAIN
CAUTION
:
Plumbing and
electrical installations must be
clear of the full rotational arc of
the door to the back of the tub.
1
1
/
4
" off to floor
Rear Tub
Service Panel
L
eft Rear tub leg
2” 90 PVC close ST
EL connected to 2”
tub drain located
on left rear tub leg
2” rubber coupler
- see item # 4 in
memo below
2” PVC pipe cut to
length on job site
2" 90
°
PVC EL SxS
10” From wall
to center line
of 2” drain
22”
2” 90 PVC Close
ST EL connected
to the 2” floor
drain female
2” PVC pipe cut to
length on job site
2” rubber coupler
- see item # 4 in
memo below
2” 90
°
PVC Close ST EL
Note
: This "U" portion
of drain must be
installed low
profile to keep
from interfering
with tub door.
Center Line
of Tub
End to End
Note
: Use a straight 90
°
PVC
elbow to run to a floor drain
2" PVC
pipe cut
to length
on job site
2" PVC Tub Drain
Support Strap
Rear Left Tub Leg
Side of Tub
FRONT VIEW
TOP VIEW
Floor
Rear Tub Lower Service Panel
Tub Drain Valve