  Isolate the actuators from the power source. 

  Remove the chains from the attachment of the window. 

  Position the dip-switches of the machine as shown in the table below. 

Dip-switch 

No. 1 

No. 2 

No. 3 

No. 4 

OFF 

OFF 

ON 

OFF 

  Power  the  machine  in  any  direction:  the  machine  automatically  moves  the  chain  in 

the  closing  and  then  opening  direction,  stopping  automatically  in  the  end  position 
(about 8 cm). 

  Cut off power to the machine. 

  Position  dip-switches  No.1  and  No.2   according  to  the  desired  stroke  (see  the 

opening stroke-end table). 

  Connect  the  machine  to  the  power  supply  again  and  carry  out  some  opening  and 

closing manoeuvres. 

10.4. Setting  for  synchronized  operation  (chain  alignment  and  address 
acquisition) 

 

IMPORTANT.  This  procedure  should  be  carried  out  for  all  the 
actuators that you want to synchronize with one another.  

 

NOTE.  In  the  case  of  just  2  actuators,  they  are  already  factory-set;  if 
there  are  more  than  2  or  in  the  event  of  replacements,  follow  the 
instructions below. 

  Ensure  that  all  the  connections  of  the  wires,  including  the  synchronization  wires, 

have been made correctly. 

  Isolate the actuators from the power source. 

  Remove the chains from the attachment of the window. 

  Position the dip-switches of the machines as shown in the table below. 

Dip-switch 

No. 1 

No. 2 

No. 3 

No. 4 

OFF 

OFF 

ON 

OFF 

  Power the machines in any direction: the machines automatically move the chain in 

the  closing  and  then  opening  direction,  stopping  automatically  in  the  end  position 
(about 8 cm). 

  Ensure that all the machines have the chains aligned at the same position (about 8 

cm).  If  the  chains  are  not  at  the  same  position,  repeat  the  procedure  from  the 
beginning. 

  Cut off power to the machines. 

  Position  the  dip-switches  according  to  the  table  below  for  acquisition  of  the 

addresses. 

Dip-switch 

No. 1 

No. 2 

No. 3 

No. 4 

OFF 

OFF 

OFF 

OFF 

Summary of Contents for CLOUD SYNCRO 230V

Page 1: ...Third edition 2014 01 CHAIN OPERATED ACTUATOR ____ CLOUD SYNCRO FORCE 300 N MAXIMUM STROKE 400 MM ELECTRICAL FEEDING 230VAC 50 HZ OR 24VDC INSTRUCTION MANUAL ENGLISH...

Page 2: ...ves conformity Contents 1 Safety indications 3 1 1 Formulas and recommendations for installation 4 1 2 Calculation of opening closure force 4 2 Maximum opening according to height of sash 4 3 Use of C...

Page 3: ...installation The manufacturer must be consulted for any other application Installation of the device must be carried out in accordance with the instructions set out by the manufacturer Failure to foll...

Page 4: ...sh only C cm Opening stroke actuator stroke H cm Height of the mobile sash For horizontal light domes or skylights F 0 54 x P Eventual weight of snow or wind on the cupola should be calculated separat...

Page 5: ...the one which reports actuator technical data Electrical feeding cable which is with 5 wires 3 blue black brown 2 white red for 230V version and with 5 wires 3 numbered 1 2 3 2 white red for 24V versi...

Page 6: ...charge Dimensions 386 5x59x37 Weight 1 180 Kg 1 150 Kg Any information reported in this table is not binding and may be susceptible to variations without notice 6 Label data and markings The actuator...

Page 7: ...ominal charge Cable section Actuator using 24 V 230V 4 00 mm2 1 000 m 3 000 m 2 50 mm2 750 m 2 200 m 1 50 mm2 450 m 1 350 m 0 75 mm2 160 m 500 m 0 50 mm2 130 m 400 m 8 Assembly These indications are i...

Page 8: ...Fig 3 Warning for window frames not on the same plane cut the part of the template coloured in grey and fix this to the moveable part of the window frame taking care to keep it in the same position D...

Page 9: ...safety is at hand B Divide the frame in 3 parts and trace 2 X C Select the correct form of brackets Fig 6 D Attach the template to the window frame fixed part and line axis up with the centre line X...

Page 10: ...ompletely closed by checking the pressure on the weather strips N On re entry the actuator limit switch functions automatically The device exerts a traction force of over 300 N to guarantee perfect se...

Page 11: ...t least one test manoeuvre In case of error the setting can be repeated in order to obtain the desired stroke 10 2 Limit switches at closure The limit switch at closure is automatic electronically ope...

Page 12: ...with one another NOTE In the case of just 2 actuators they are already factory set if there are more than 2 or in the event of replacements follow the instructions below Ensure that all the connectio...

Page 13: ...ral synchronism error Check the settings of the dip switches or repeat the procedure for alignment and address acquisition 11 Checking for correct assembly Check that the window has closed completely...

Page 14: ...We recommend that the device itself and any accessories packaging etc be sent to a centre for ecological recycling 15 Warranty The Manufacturer guarantees good machine function and undertakes to repla...

Page 15: ...the sticker label with the identification code of the article invalidates the warranty Before the intervention of an authorized technician the buyer has to prove the presence of the original power cab...

Page 16: ...age 16 MASTER S r l s p 37 Conversano Castiglione km 0 7 z i 70014 Conversano Bari Italy C P 81 ITALY 39 080 4959823 Fax 39 080 4959030 http www masteronline biz info masteronline biz I461A 06 07 2015...

Reviews: