2
CONTENTS
PAGE
1.0 INTRODUCTION
4
1.1 ITEMS SUPPLIED WITH THE FIRE
4
1.2 HANDLING AND TRANSPORT
4
1.3 WARNINGS
5
1.4 CAUTIONS
5
2.0 TECHNICAL SPECIFICATIONS RANGITATA MASONRY INSERT
6
3.0 INSERT INSTALLATION THE RANGITATA ULEB
7
3.1 UNPACKING
7
3.2 MASONRY CHIMNEY PREPARATION
7
3.3 DISTANCES TO HEAT SENSETIVE MATERIALS
7
3.4 FLOOR PROTECTOR REQUIREMENTS
8
3.5 REDUCING CLEARANCES
10
3.6 FLUE REQUIREMENTS
11
3.7 INSTALLING THE FIREBOX AND FLUE
12
3.8 INSTALLING THE FASCIA
12
3.9 INSTALLING BRICKS AND BAFFLE
13
4.0 TECHNICAL SPECIFICATIONS RANGITATA BUILT-IN (ZC)
15
5.0 BUILT-IN (ZC) INSTALLATION THE RANGITATA ULEB
16
5.1 THINGS TO CONSIDER BEFORE CONSTRUCTING BUILT-IN
17
5.2 STAGES OF THE RANGITATA ULEB INSTALLATION
18
6.0 OPERATIONAL INSTRUCTIONS FOR RANGITATA ULEB
25
6.1 PREPARING THE BURNER FOR FIRST LIGHT-UP
25
6.2 PERMITTED FUELS
25
6.3 TESTING WOOD MOISTURE
25
6.4 RECOMMENDED LOG SIZES & FIRE STARTERS
26
7.0 OPERATIONAL SEQUENCE
26
7.1 BEFORE FIRST LIGHT-UP
26
7.2 COLD START-UP
26
7.2.1 KI INTERMEDIATE LOAD 1
26
7.2.2 INTERMEDIATE LOAD 2
27
7.2.3 MAIN LOAD
27
7.2.4 RE-FUELING & SHUT-DOWN
27
8.0 OPERATING HINTS FOR CLEAN BURNING
28
9.0 MAINTENANCE OF THE REANGITATA ULEB
29
9.1 ASH REMOVAL
29
9.2 CLEANING THE GLASS
29
9.3 CLEANING THE FASCIA
29
9.4 ADJUSTING THE DOOR LATCH
29
9.5 DOOR AND DOOR GLASS SEAL
29
9.6 HEAT OUTPUT CONTROL (AIR SLIDE)
29
9.7 FIREBOX MASONRY BRICKS
29
9.8 SECONDARY AIR TUBES REMOVAL
30
Summary of Contents for RANGITATA ULEB
Page 21: ...21 Fig 14 Contents of the Rangitata Zero Clearance Box Pack ...
Page 34: ...34 ...