3
P/N 27740
10/11
3
rEQUIrEMENts For sUCCEssFUL INstaLLatIoN
CAUTION:
DO NOT
use drywall screws to secure fl anges to wall studs. Product damage will occur and will void the warranty.
◘
Read complete instructions before beginning installation.
◘
These instructions include suggestions for rough construction and plumbing installation that we believe to be reliable.
Local building codes vary and could supersede those suggestions. If you are not confident in your ability to perform
these tasks, contract out those tasks you need help with or use a professional installer.
◘
Confirm that your model will fit in intended location and plumbing fixtures are located where required before beginning
installation.
◘
Walls and sub-floor must be solid, plumb, and square.
◘
Use drop cloth to protect base from damage during installation.
◘
Do not install in areas where temperature may drop below 32ºF (0ºC).
◘
Allow product to reach room temperature for 30 minutes before installation.
◘
Two people recommended to install this product.
roUghINg-IN
A
C
48" x 34"
60" x 34"
A
48"
60"
B
24"
30"
C
9-3/8"
15-3/8"
12"
9-1/4"
12"
9-1/4"
32-1/2"
C
B
14-5/8"
14-5/8"
Drain cutout
5" diameter max.
15-1/4"
35-1/2"
1-1/4"
2" x 4"
lumber
2" x 4"
lumber
Studs must
be plumb
and square.
◘
Rough plumbing and base must be installed before panel installation.
◘
Studs should be located as shown above.
Install additional studs as shown to secure top fl anges.
Install additional studs as shown for side panel support. Stud length must be 67" high and be located 7-1/4" from the fl oor.
◘
For masonry construction, floor and walls must be framed to accommodate plumbing and installation.