Installation
5.
Add measurement X from table 2 to measurement A.
6.
On the chute wall, mark a circular arc around the midpoint with
the measurement determined in step 5 (1, Fig. 1).
7.
Mark a horizontal line below the horizontal centre line of the
head drum at a distance of Z (see table 3). The intersection with
the arc marked in step 5 is the midpoint of the mainframe (3,
Fig. 2).
Diameter of the
drum* in mm
QC
™
#1 HD MT
PD QC
™
#1 HD MT
Measurement X in mm
300 to 375
89
102
400 and more
89
89
*incl. Friction material and conveyor belt
Tab. 2: X values for positioning of the mainframe
Fig. 2: Marking the installation height
WARNING! DANGER OF INJURY!
The primary cleaner is heavy and can cause serious injury if it falls
when being lifted or moved.
Only lift the primary cleaner using suitable lifting equipment or with
several persons. Do not stand under suspended loads.
QC
™
#1 HD MT
PD QC
™
#1 HD MT
Measurement Z in mm min.
216
229
Tab. 3: Installation height Z (See Fig. 2 )
Z min.
(See
3
90°
90
90°
Table 3)