![background image](http://html1.mh-extra.com/html/mars/atl-15-sl/atl-15-sl_operation-and-maintenance-manual_1730617029.webp)
29
Pass one end of the thread through the lug at the end of the riser and bind it with
the second thread end using three nodes. Excess lengths of the threads are cut
at distance 15 to 20 mm from the nodes (fig. 22).
The same task is performed for the second riser.
Fig. 22
Within compliant distance from the risers, pass the lines through the rubber bands
at the container bottom (fig. 23a).
Loose ends of the packaging flap are open and used for covering the risers
connection with the container (fig. 23b).
a)
b)
Fig. 23
Summary of Contents for ATL-15 SL
Page 2: ...2...
Page 4: ...4...
Page 13: ...13 Fig 5...
Page 16: ...16 Fig 6...
Page 22: ...22 Fig 12 Fig 13...
Page 27: ...27 Fig 19 a b c d e...
Page 41: ...41 Fig 45 Fig 46...
Page 50: ...50...
Page 51: ...51 The label completion and marking of the emergency parachute ATL 88 90 1B ATL 15 SL...