![Mars ATL-15 SL Operation And Maintenance Manual Download Page 33](http://html1.mh-extra.com/html/mars/atl-15-sl/atl-15-sl_operation-and-maintenance-manual_1730617033.webp)
33
4.7. Placing the pilot chute and closing the container
The pilot chute with the stop is placed on the folded bridle and the auxiliary
packaging cords are passed through the tapes with inserted metal grommets in
the lower part of the pilot chute. Auxiliary packaging cord at the lower flap of the
container is then passed through the metal grommet in the lower flap. Use the
auxiliary packing cords to pull up the closing cord lugs which are secured by
means of packaging mandrels (fig. 30).
Fig. 30
The auxiliary packing cords are passed through the tapes with metal grommets in
the top part of the pilot chute, the pilot chute springs are pressed, the fabric of the
canopy is placed in the centre direction between the spring threads, and the
closing cord lugs are pulled out by means of auxiliary packing cords; the closing
cord lugs are then secured with auxiliary packing mandrels (fig. 31).
Summary of Contents for ATL-15 SL
Page 2: ...2...
Page 4: ...4...
Page 13: ...13 Fig 5...
Page 16: ...16 Fig 6...
Page 22: ...22 Fig 12 Fig 13...
Page 27: ...27 Fig 19 a b c d e...
Page 41: ...41 Fig 45 Fig 46...
Page 50: ...50...
Page 51: ...51 The label completion and marking of the emergency parachute ATL 88 90 1B ATL 15 SL...