![Mars ATL-15 SL Operation And Maintenance Manual Download Page 28](http://html1.mh-extra.com/html/mars/atl-15-sl/atl-15-sl_operation-and-maintenance-manual_1730617028.webp)
28
a)
b)
Fig. 20
4.5. Inspection of the lines placing
The packing employee will check the lines placing for correctness.
4.6. Placing of the canopy into the container
Risers of the harness are bent into the container. Attach the red threads with
strength 48 to 69 N to the red tape loops, sewn between the packaging flap
and the central part of the container (fig. 21).
Fig. 21
Summary of Contents for ATL-15 SL
Page 2: ...2...
Page 4: ...4...
Page 13: ...13 Fig 5...
Page 16: ...16 Fig 6...
Page 22: ...22 Fig 12 Fig 13...
Page 27: ...27 Fig 19 a b c d e...
Page 41: ...41 Fig 45 Fig 46...
Page 50: ...50...
Page 51: ...51 The label completion and marking of the emergency parachute ATL 88 90 1B ATL 15 SL...