![Markes International UNITY-Air Server-xr Installation Manual Download Page 37](http://html.mh-extra.com/html/markes-international/unity-air-server-xr/unity-air-server-xr_installation-manual_1727984037.webp)
QUI-1122
Page 37
Markes International Ltd
T:
+44 (0)1443 230935
F:
+44 (0)1443 231531
www.markes.com
Chemstation software as the number is rounded to 1000.0 minutes. Setting this value forces the
split/splitless inlet to remain permanently in the splitless mode.
The purge flow value is irrelevant. Once the split/splitless inlet has been configured as described the
column head pressure can be setup to give the desired flow rate/ velocity down the column.
6.2
UNITY–Air Server-xr Electronic Gas Control with the Agilent 7890GC
NOTE:
To complete this installation the following 7890 parts are recommended. They can be ordered
directly from Agilent.
Part no.
Description
Quantity
G3430-60011
Replacement hoodlum block assemblies
1
However, if these parts are not available at installation both the carrier gas and septum purge lines
running between the EPC module and the Split/Splitless injector must be cut and extended using 1/8”
unions and green PEEK tubing in order to facilitate connection to UNITY–Air Server-xr.
6.2.1
Procedure
Remove the top rear cover on the GC to provide access to the EPC module that is going to be used to
regulate the carrier gas supply to UNITY–Air Server-xr.
Remove the two hoodlum block assemblies, for the carrier supply and septum purge lines, from the
split/splitless EPC module.
Location of fixing screws for bulkhead connectors
Fit the two replacement hoodlum block assemblies, and route the 1/16” tubing on both of these
assemblies through the rear panel of the GC and towards the UNITY–Air Server-xr.
NOTE
: the carrier gas supply line has a 1/8” termination at the TD end while the septum purge line
terminates in 1/16” tubing.
If replacement hoodlum block assemblies are not available, the septum purge and carrier gas lines
must be cut, extended, using 1/8” brass unions and 1/16” green PEEK tubing, and routed through
the rear panel of the GC towards UNITY–Air Server-xr. The lengths of PEEK tubing used should be no
longer than required to reach the UNITY–Air Server-xr.
EPC Module viewed
from above
EPC Module
viewed from
rear
Septum Purge
Connector
Carrier Supply
Connector