![Markes International UNITY-Air Server-xr Installation Manual Download Page 36](http://html.mh-extra.com/html/markes-international/unity-air-server-xr/unity-air-server-xr_installation-manual_1727984036.webp)
QUI-1122
Page 36
Markes International Ltd
T:
+44 (0)1443 230935
F:
+44 (0)1443 231531
www.markes.com
Location of EPC module with the 2 port EPC block fitted
If a replacement EPC block assembly is not available, the septum purge and carrier gas lines must be
cut, extended, using 1/8” brass unions and 1/16” green PEEK tubing, and routed through the rear
panel of the GC towards UNITY–Air Server-xr. The lengths of PEEK tubing used should be no longer
than required to reach the UNITY–Air Server-xr.
Carrier and septum purge lines extended with unions and PEEK tubing
The stainless steel tubing for the carrier supply line is 1/16” while the septum purge line is 2 mm and will
require a different ferrule when connected to the 1/8” brass union.
NOTE
: two 1/8” brass unions, 3 m of 1/16” green PEEK tubing and 1/8” graphitized vespel ferrules,
including one for 2 mm tubing, are all contained within the Agilent GC Installation Kit.
Connect the carrier gas supply line to the ‘Carrier Inlet’ port of UNITY–Air Server-xr and connect the
septum purge line to the ‘Pressure Outlet’ port.
6.1.2
6890 inlet settings
Before the column pressure value is set, the MODE of operation of the inlet has to be configured.
For correct control of UNITY–Air Server-xr the mode must be set only to SPLITLESS, and not split.
In addition the splitless purge time value must be set to 999.99 minutes directly through the keyboard of
the GC (6890 firmware revision A.03.08 or later required). This value cannot be set using the
1/8” Unions allowing
extension of gas lines
Replaced 2 port
EPC block
Routed tubing to
UNITY-xr
Standard 3 port
EPC block
Lines cut
here