Install an exhaust connection with a manhole for cleaning.

• 

If possible the exhaust pipe must be short and with a minimum slope of 5% from the boiler to the chim-

ney upwards.

• 

Carefully install the exhaust pipe, which is fastened only to the chimney, and put it on the exhaust fumes 

nozzle so that it can not slip out.

• 

Attach additional pipes over 2 m long. All parts of the exhaust pipe must consist of non-combustible 

materials.

Attention!!! Suffocation hazard due to lack of oxygen in the installation room. 

• 

 Ensure sufficient fresh air supply through holes out.

• 

 Risk of injury/damage to equipment due to lack of combustion air can lead to tar and noxious gas 

formation. 

• 

 Ensure sufficient fresh air supply through holes out. 

• 

 Notify the user of the installation that these holes must remain open.

Building Hydraulic Connections

Instruction!!! Damaging the installation due to non-isolated joints. Install the connecting pipes without ten-

sion to the boiler joints.
Info: For low condensation of exhaust fumes and extending the boiler life, we recommend to equip it with a 

return temperature raising device. It prevents dropping of boiler water temperature below 55 °C.
The next step after installing the boiler and connecting it to the pipelines and power supply is filling the boiler 

and the adjacent heating system with water. Check all connections of the boiler, internal and external, for leaks.

Check the position of the ceramic components in the burning chamber and all electric connections.

The pellet hopper should be filled to at least ½ of its volume in order to ensure sufficient amount of pellets for 

the boiler to be started. 

Connecting the safety heat exchanger

In the countries where the EN 303-5 is in force, the heating boiler must be provided with overheating pro-

tection. By doing so the maximum water temperature of 100º С won’t be exceeded (overheating protection).

The minimal working pressure of the water must be equal to 2 bar (the maximum – to 6,0 bar). There must be 

an available capacity of at least 11 l/min. 

• 

Connect the safety heat exchanger according to the hydraulic chart with a thermal safety switch (acces-

sories).

• 

Mount a filter in the flow of cooling water to the thermostatic valve.

Filling the heating installation and insulation check

Check insulation before putting the installation into operation in order to ensure that no leaks are present. 

Exercise upon the heating boiler a pressure equal to 1,3 of the allowed working pressure (keep in mind the 

safety pressure of the safety guard valve).
Instruction!!! Installation damage due to freezing.

• 

If the heating installation and the pipe network are not constructed with anti-freezing protection, we 

recommend filling the installation with liquid with a low freezing point and anti- corrosion and an-

ti-freezing agent.

• 

Installation damage due to excessive pressure during the insulation test. Pressure devices, regula-

tors and safety switches may be damaged due to high pressure.

• 

Make sure that during the insulation test no pressure devices, the joints to the water tank of which can-

not be closed, are mounted.

• 

Close the connection between the enlarging pot and the system by closing the valve.

• 

Open the mixing and the stopping valves from the water heated side.

• 

Connect the tubing to the water valve. Place a hose full of water on to the hose socket of the loading and 

unloading valve, secure it with a clamp and open the loading and unloading valve.

• 

Turn the cap of the automated air tighten-er one full spin so the air can be pumped out.

• 

Slowly fill the heating installation. During this process watch the pressure indication (manometer).

• 

When the desired working pressure is reached close the water valve and the loading and unloading valve.

• 

Check the insulation of the connections and the pipes.

• 

Pump the air out of the heating installation via the air tightening radiator valves.  

• 

If after the air tightening the working pressure decreases additional water must be filled in.

• 

Release the hose from the loading and unloading valve.

Summary of Contents for CBM 45

Page 1: ...Pellet Water Boiler CBM 45 Assembly and exploitation manual Mareli Systems...

Page 2: ...ion and exploitation manual of the pellet bunker if the device is provided with one The non fulfillment of prescriptions and violation of active regulations and directives may lead to damage and unexp...

Page 3: ...ed service technician to establish whether the equipment is safe There is a risk of thermostat damage and melting the flexible pellet feeding tube To prevent backfire it should be checked if the burne...

Page 4: ...oiler needs to be well levelled thus ensuring its proper venting Attention Fire risk due to flammable materials and liquids Make sure no flammable materials and or liquids are in the vicinity of the h...

Page 5: ...pressure of the water must be equal to 2 bar the maximum to 6 0 bar There must be an available capacity of at least 11 l min Connect the safety heat exchanger according to the hydraulic chart with a...

Page 6: ...installation for user Attention Hazard to life in case of non observation of the safety prescriptions Functions of Individual Elements Strong fanning can lead to flame extinguishing due to excessive...

Page 7: ...a temperature of around 90 is reached Remove the tar from the floor and the heating surfaces by the cleaning spade Boiler Inspection and Maintenance Why is regular maintenance important These are the...

Page 8: ...an be monitored on the display Warranty The manufacturer guarantees correct and reliable operation of the product only when requirements for in stallation and operation are met according to the manual...

Page 9: ...tat open flame return from the brazier Er07 Encoder Error The error may occur due to lack signal from Encoder Er08 Encoder Error The error can occur due to problems of adjustment of the number of revo...

Page 10: ...ond case the user selects the desired power On the left side of the display are signalled the combustion modality A automatic combustion M manual combustion and the working power of the system Recipe...

Page 11: ...day at the desired time Ex 6 30 The system turns on at 20 30 on Tuesday and turns off at 6 30 on Wednesday Weekly The programs are the same for all days of the week Week end Choose between Monday Fri...

Page 12: ...12 Mareli Systems WIRING DIAGRAM SMB 50...

Page 13: ...13 Mareli Systems WIRING DIAGRAM PB 40 52...

Page 14: ...14 Mareli Systems NOTES...

Page 15: ......

Page 16: ...hey are due to printing or transcription errors We reserve the right to make any change that appears to be necessary or useful without harm the essential characteristics MareliSystems IndustrialZone S...

Reviews: