2. Boiler Transporting and Installing

The boiler should be transported packed onto the transport pallet to the installation site. During transporta-

tion the boiler and the hopper must be in secured vertical position. The boiler must be on the transport pallet 

provided by the manufacturer.

Unwrap in an ecologically clean manner. Respect, construction and ventilation requirements, especially the 

active norms for burning devices and storing of burning materials as ventilation in the room where the unit 

will be installed.

After positioning the boiler in the designated place, it must be 

levelled with anti vibration pads. The fuel hopper is positioned at 

the right/left side of the boiler and levelled accordingly. Levelling 

must be very precise as the connections have too little margin for 

error. Both objects are to be joined by 4 М8 bolts.

The burner is mounted to the side of the boiler in the opening 

under the pellet container to the pre-assembled intermediate 

flange and tightened with braces.

Minimum spacing from wall should be not less than 200 mm. 

Minimum spacing in front of the boiler should be 1000 mm. The 

non-combustible mounting surface and the  foundation must be 

flat and horizontal; if necessary, place wedges of non-combus-

tible material. If the foundation is not horizontal, the side with 

connections (rear) may stand 5 mm higher in order to improve 

ventilation and air circulation.

The foundation must be larger than the boiler base. With at least 300 mm on the front side and with 100 mm 

on the other sides. 

Boiler installation in home lived-in rooms is prohibited!!!

Once positioned the boiler must be connected to the heating system and to the chimney in compliance with 

the applicable requirements.

For proper and reliable function the boiler needs to be well levelled, thus ensuring its proper venting.

Attention!!! Fire risk due to flammable materials and liquids.

• 

Make sure no flammable materials and/or liquids are in the vicinity of the heating boiler.

• 

Indicate the user of the installation the minimal distances to flammable and non-flammable materials.

Boiler Installation

Installation requirements for boiler Mareli CBM 45:

• 

Chimney requirements.

• 

Heating system requirements.

• 

Hydraulic connection

• 

Connecting the PIC valve

• 

Connecting the protective heat exchanger

• 

Filling the heating system and checking for tightness

Note that connecting of the boiler to the chimney must be carried out in accordance with the requirements 

of the local construction supervision and coordinated with the chimney sweep. Installation of Mareli CBM 

45 boiler to heating system should only be performed by trained technicians authorized by the manufacturer. 

Such a boiler, according to BDS 303-5/2000, can be connected to the following types of systems:

• 

High temperature (up to 90°C) heating system with open or closed expansion tank with a maximum 

operating pressure 2 bar. When the system is equipped with a membrane expansion tank, it must have a 

minimum volume of 35 l. And a safety pressure valve up to 3 bar. 

• 

Low temperature (up to 55°C) heating installation (underfloor heating or hot air convector) open or 

closed. It is compulsory to install a mixing unit for lowering the temperature of the coolant past the 

boiler.

Note: Operation at temperatures of the coolant in the boiler below 55° C is not allowed. In such a case the 

warranty does not apply!!!

Good chimney drought is essential for proper functioning of the boiler. Boiler capacity and economical opera-

tion depend largely on it. At lower levels of draught it is recommended to use a fan for facilitating the removal 

of exhaust gases. The advantages of such a fan are:
• 

Providing additional chimney draught

• 

Automatic air flow adjustment  

Fan for removal of exhaust fumes VFC /150

Summary of Contents for CBM 45

Page 1: ...Pellet Water Boiler CBM 45 Assembly and exploitation manual Mareli Systems...

Page 2: ...ion and exploitation manual of the pellet bunker if the device is provided with one The non fulfillment of prescriptions and violation of active regulations and directives may lead to damage and unexp...

Page 3: ...ed service technician to establish whether the equipment is safe There is a risk of thermostat damage and melting the flexible pellet feeding tube To prevent backfire it should be checked if the burne...

Page 4: ...oiler needs to be well levelled thus ensuring its proper venting Attention Fire risk due to flammable materials and liquids Make sure no flammable materials and or liquids are in the vicinity of the h...

Page 5: ...pressure of the water must be equal to 2 bar the maximum to 6 0 bar There must be an available capacity of at least 11 l min Connect the safety heat exchanger according to the hydraulic chart with a...

Page 6: ...installation for user Attention Hazard to life in case of non observation of the safety prescriptions Functions of Individual Elements Strong fanning can lead to flame extinguishing due to excessive...

Page 7: ...a temperature of around 90 is reached Remove the tar from the floor and the heating surfaces by the cleaning spade Boiler Inspection and Maintenance Why is regular maintenance important These are the...

Page 8: ...an be monitored on the display Warranty The manufacturer guarantees correct and reliable operation of the product only when requirements for in stallation and operation are met according to the manual...

Page 9: ...tat open flame return from the brazier Er07 Encoder Error The error may occur due to lack signal from Encoder Er08 Encoder Error The error can occur due to problems of adjustment of the number of revo...

Page 10: ...ond case the user selects the desired power On the left side of the display are signalled the combustion modality A automatic combustion M manual combustion and the working power of the system Recipe...

Page 11: ...day at the desired time Ex 6 30 The system turns on at 20 30 on Tuesday and turns off at 6 30 on Wednesday Weekly The programs are the same for all days of the week Week end Choose between Monday Fri...

Page 12: ...12 Mareli Systems WIRING DIAGRAM SMB 50...

Page 13: ...13 Mareli Systems WIRING DIAGRAM PB 40 52...

Page 14: ...14 Mareli Systems NOTES...

Page 15: ......

Page 16: ...hey are due to printing or transcription errors We reserve the right to make any change that appears to be necessary or useful without harm the essential characteristics MareliSystems IndustrialZone S...

Reviews: