5-22
Published 3-22-2021, Control # 702-02
SET-UP AND INSTALLATION
GRT8120 OPERATOR MANUAL
Front Mounting Pin Handle
The front mounting pin handle (5, Figure 5-26) moves in
unison with the front mounting pin (3), providing a visual cue
for operators outside of the operator cab to know the status
of the front boom extension mounting pin (3):
•
Handle up—The front mounting pin (3) is extended in
the front mounting bracket and the boom nose
installation pins (4) are unlocked.
•
Handle down—The front mounting pin (3) is retracted
and the installation pins (4) are locked.
The handle is also used to manually release the front boom
extension mounting pin interlock so that the boom extension
can be removed from the crane.
FIGURE 5-26
2
1
3
5
Installation Pins (4) Locked
Installation Pins (4) Unlocked
4
4
4
4
6
6
6
6
Front Mounting Pin (3) Unlocked
Front Mounting Pin (3) Locked
4
4
Summary of Contents for Grove GRT8120
Page 1: ...Operator Manual Grove GRT8120 ...
Page 4: ...THIS PAGE BLANK ...
Page 16: ...TABLE OF CONTENTS GRT8120 A 12 THIS PAGE BLANK ...
Page 24: ...INTRODUCTION GRT8120 OPERATOR MANUAL 1 8 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Page 440: ...GRT8120 OPERATOR MANUAL A 10 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Page 447: ......
Page 448: ......