![Manitowoc Grove GRT8120 Operator'S Manual Download Page 156](http://html.mh-extra.com/html/manitowoc/grove-grt8120/grove-grt8120_operators-manual_701202156.webp)
OPERATING PROCEDURES
GRT8120 OPERATOR MANUAL
4-26
Published 3-22-2021, Control # 702-02
Telescoping - Theory of Operation
The following section describes the internal operation of a
pinning boom.
The telescoping process requires locking and unlocking
processes in the main boom. The main boom can be
telescoped in different ways.
Manual Telescoping
For manual telescoping, the operator must initiate some
locking and unlocking processes at the right time.
Semi-automatic Telescoping
When telescoping with semi-automation, the operator enters
a telescoping sequence or “tele picture” and the Crane
Control System (CCS) controls all of the locking and
unlocking processes automatically. This mode can also be
used for intermediate lengths.
NOTE:
For more information on telescoping with
semi-automation refer to
.
Summary of Contents for Grove GRT8120
Page 1: ...Operator Manual Grove GRT8120 ...
Page 4: ...THIS PAGE BLANK ...
Page 16: ...TABLE OF CONTENTS GRT8120 A 12 THIS PAGE BLANK ...
Page 24: ...INTRODUCTION GRT8120 OPERATOR MANUAL 1 8 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Page 440: ...GRT8120 OPERATOR MANUAL A 10 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Page 447: ......
Page 448: ......