![Manitowoc Grove 5540F Operator'S Manual Download Page 95](http://html.mh-extra.com/html/manitowoc/grove-5540f/grove-5540f_operators-manual_701177095.webp)
GROVE
Published 10-21-2011, Control # 055-03
6-3
5540F/YB5515 OPERATOR’S MANUAL
MAINTENANCE
6
PREVENTIVE MAINTENANCE
Maintenance Schedule and Checklist
NOTE:
Hour intervals in each maintenance chart show the
correct time for service. The hourmeter located in
the operator’s cab indicates the total hours the
crane has been running.
In addition to the following scheduled maintenance,
perform the scheduled maintenance suggested in
the engine manual furnished with the crane.
When performing maintenance, do the required
maintenance interval as well as all previous interval
maintenance. For example, when performing the
250 hour (monthly) maintenance interval, perform
all the tasks required for daily, 50 hour and 100
hour maintenance.
Reference Only