![Manitowoc Grove 5540F Operator'S Manual Download Page 91](http://html.mh-extra.com/html/manitowoc/grove-5540f/grove-5540f_operators-manual_701177091.webp)
GROVE
Published 10-21-2011, Control # 055-03
5-11
5540F/YB5515 OPERATOR’S MANUAL
ATTACHMENTS
5
4 PART WIRE ROPE REEVING
Place the wire rope over the top sheave in the boom head
and then down and over the lower left sheave. Thread rope
through one of the sheaves in the hoist block and then over
the second lower sheave in the boom head. Continue by
threading the rope through the second sheave in the hoist
block.
NOTE:
It may be easier to place the wire rope over the
sheaves if you remove the hair cotter pins and wire
rope retaining pins from the boom head and hoist
block. Install pins after the wire rope is installed.
Connect the loose end of the wire rope to the ear on the
crane side of the boom head with a socket and wedge. See
instructions in this section.
Top Sheave In
Boom Head
Socket
(Connect to Ear
on Boom Head)
Boom Sheaves In
Boom Head
Sheave In
Hoist block
a0136
FIGURE 5-15
Reference Only