1 - 10
B – MAINTENANCE
- Clean away any trace of oil or grease from the platform.
- Clean the platform, or at least the area concerned, before performing any work.
- Do not clean with high-pressure equipment near to the electrical components.
If necessary, protect components liable to damage from penetration by water, steam or cleaning products and protect
the electrical components and connections in particular
- The platform must compulsorily be maintained and kept in a condition of conformity.
- Carry out daily maintenance (see Chapter: B – EVERY DAY OR EVERY 5 HOURS OF OPERATION).
Summary of Contents for 105 VJR 2
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...1 1 1 INSTRUCTIONS 1 INSTRUCTIONS...
Page 8: ......
Page 19: ...2 1 2 DESCRIPTION 2 DESCRIPTION...
Page 20: ......
Page 21: ...2 3...
Page 25: ...2 7 3 2 1 1 2 1 2 3 4 5 6 7 8 3 9 10 3 2 1 0 1 2 3 10 1 2 3 4 5 6 7 8 9 N O P Q 105 VJR 2...
Page 26: ...2 8 80VJR 1 2 3 4 5 6 7 1 2 3 4 5 6 7 3 2 1 0 1 2 3 N O P Q...
Page 27: ......
Page 28: ...2 10 CONTROL INSTRUMENTS A GROUND CONTROL POINTS 13 HOURS 1 10 0 1 8 12 5 7 4 3 11 9 10 6 2 1...
Page 30: ...2 12 CONTROL INSTRUMENTS B CONTROL POINT ON THE PLATFORM 17 18 15 14 19 24 24 20 16 22 21 23...
Page 45: ...3 MAINTENANCE 3 MAINTENANCE 3 1...
Page 46: ......
Page 61: ...4 1 4 MAINTENANCE HANDBOOK 4 MAINTENANCE HANDBOOK...
Page 62: ......
Page 70: ......