
2 - 23
On completion of the operation, remember to close valve control again
(Ref.4, Fig. E) until it is in its original position - collerette flush
TO LOWER THE PENDULAR ARM :
- Remove the cap 6 (Fig. F).
- Screw the valve 7 (Fig. F).
- Screw the wheel 4 (Fig. E) until movement starts.
When the operation is complete, remember :
- to loosen the valve 7 (Fig. F) to its initial position.
- to refit the cap 6 (Fig. F).
- to unscrews the wheel 4 (Fig. E) to its initial position.
F
E
7
4
6
Summary of Contents for 105 VJR 2
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...1 1 1 INSTRUCTIONS 1 INSTRUCTIONS...
Page 8: ......
Page 19: ...2 1 2 DESCRIPTION 2 DESCRIPTION...
Page 20: ......
Page 21: ...2 3...
Page 25: ...2 7 3 2 1 1 2 1 2 3 4 5 6 7 8 3 9 10 3 2 1 0 1 2 3 10 1 2 3 4 5 6 7 8 9 N O P Q 105 VJR 2...
Page 26: ...2 8 80VJR 1 2 3 4 5 6 7 1 2 3 4 5 6 7 3 2 1 0 1 2 3 N O P Q...
Page 27: ......
Page 28: ...2 10 CONTROL INSTRUMENTS A GROUND CONTROL POINTS 13 HOURS 1 10 0 1 8 12 5 7 4 3 11 9 10 6 2 1...
Page 30: ...2 12 CONTROL INSTRUMENTS B CONTROL POINT ON THE PLATFORM 17 18 15 14 19 24 24 20 16 22 21 23...
Page 45: ...3 MAINTENANCE 3 MAINTENANCE 3 1...
Page 46: ......
Page 61: ...4 1 4 MAINTENANCE HANDBOOK 4 MAINTENANCE HANDBOOK...
Page 62: ......
Page 70: ......